Kitefoil
Which kite?
ShowStock
| Cabrinha | 2027 | 5 m² | 1.9 kg | 21–36 knots | €1,559 | |
| Cabrinha | 2027 | 6 m² | 2.07 kg | 19–34 knots | €1,649 | |
| Cabrinha | 2027 | 7 m² | 2.25 kg | 17–33 knots | €1,739 | |
| Cabrinha | 2027 | 8 m² | 2.45 kg | 16–32 knots | €1,829 | |
| Cabrinha | 2027 | 9 m² | 2.65 kg | 14–30 knots | €1,919 | |
| Cabrinha | 2027 | 10 m² | 2.87 kg | 13–28 knots | €1,999 | |
| Cabrinha | 2027 | 11 m² | 3.02 kg | 12–27 knots | €2,099 | |
| Cabrinha | 2026 | 7 m² | 2.32 kg | 19–38 knots | €1,769 | |
| Cabrinha | 2026 | 8 m² | 2.52 kg | 17–36 knots | €1,859 | |
| Cabrinha | 2026 | 9 m² | 2.7 kg | 15–34 knots | €1,939 | |
| Cabrinha | 2026 | 10 m² | 2.88 kg | 13–32 knots | €1,999 | |
| Cabrinha | 2026 | 12 m² | 3.23 kg | 9–25 knots | €2,199 | |
| Cabrinha | 2026 | 13 m² | 3.16 kg | 9–18 knots | €2,199 | |
| Cabrinha | 2026 | 15 m² | 3.5 kg | 8–16 knots | €2,299 | |
| Cabrinha | 2026 | 17 m² | 3.7 kg | 6–15 knots | €2,399 | |
| Cabrinha | 2027 | 6 m² | 2.47 kg | 20–38 knots | €1,869 | |
| Cabrinha | 2027 | 7 m² | 2.66 kg | 18–35 knots | €1,879 | |
| Cabrinha | 2027 | 8 m² | 2.85 kg | 16–33 knots | €2,089 | |
| Cabrinha | 2027 | 9 m² | 3.05 kg | 13–30 knots | €2,199 | |
| Cabrinha | 2027 | 10 m² | 3.24 kg | 11–28 knots | €2,299 | |
| Cabrinha | 2027 | 12 m² | 3.64 kg | 9–24 knots | €2,299 | |
| Cabrinha | 2026 | 7 m² | 2.54 kg | 19–38 knots | €1,327 | |
| Cabrinha | 2026 | 8 m² | 2.78 kg | 17–36 knots | €1,394 | |
| Cabrinha | 2026 | 5 m² | 2.14 kg | 23–37 knots | €1,189 | |
| Cabrinha | 2026 | 6 m² | 2.35 kg | 20–35 knots | €1,239 | |
| Cabrinha | 2026 | 7 m² | 2.54 kg | 18–32 knots | €1,289 | |
| Cabrinha | 2026 | 8 m² | 2.76 kg | 16–30 knots | €1,329 | |
| Cabrinha | 2026 | 9 m² | 2.95 kg | 13–27 knots | €1,379 | |
| Cabrinha | 2026 | 10 m² | 3.19 kg | 11–25 knots | €1,429 | |
| Cabrinha | 2026 | 11 m² | 3.35 kg | 10–23 knots | €1,469 | |
| Cabrinha | 2026 | 12 m² | 3.56 kg | 9–21 knots | €1,519 | |
| Cabrinha | 2026 | 14 m² | 3.95 kg | 7–19 knots | €1,609 | |
| Cabrinha | 2026 | 8 m² | 2.65 kg | 16–32 knots | €2,599 | |
| Cabrinha | 2026 | 9 m² | 2.8 kg | 13–29 knots | €2,699 | |
| Cabrinha | 2026 | 10 m² | 2.95 kg | 11–27 knots | €2,799 | |
| Cabrinha | 2026 | 12 m² | 3.34 kg | 9–23 knots | €2,999 | |
| Core | ≈ 2025 | 15 m² | — | 8–20 knots | €2,499 | |
| Core | ≈ 2025 | 17 m² | — | 7–19 knots | €2,599 | |
| Core | ≈ 2025 | 15 m² | — | 8–20 knots | €3,499 | |
| Core | ≈ 2025 | 17 m² | — | 7–19 knots | €3,699 | |
| Core | 2024 | 5 m² | — | 23–42 knots | €829 | |
| Core | 2024 | 6 m² | — | 20–37 knots | €859 | |
| Core | 2024 | 7 m² | — | 17–34 knots | €889 | |
| Core | 2024 | 8 m² | — | 16–31 knots | €909 | |
| Core | 2024 | 9 m² | — | 14–29 knots | €939 | |
| Core | 2024 | 10 m² | — | 13–27 knots | €999 | |
| Core | 2024 | 11 m² | — | 12–26 knots | €1,049 | |
| Core | 2024 | 12 m² | — | 11–24 knots | €1,109 | |
| Core | 2024 | 13.5 m² | — | 10.5–22 knots | €1,159 | |
| Core | 2024 | 15 m² | — | 9–20 knots | €1,219 | |
| Core | 2024 | 17 m² | — | 8–19 knots | €1,269 | |
| Core | 2024 | 7 m² | — | 20–37 knots | €639 | |
| Core | 2024 | 8 m² | — | 17–34 knots | €659 | |
| Core | 2024 | 9 m² | — | 15–30 knots | €699 | |
| Core | 2024 | 11 m² | — | 13–22 knots | €759 | |
| Core | 2024 | 13 m² | — | 11–19 knots | €819 | |
| Core | 2024 | 15 m² | — | 10–17 knots | €879 | |
| Core | 2025 | 5 m² | — | 22–42 knots | €1,349 | |
| Core | 2025 | 6 m² | — | 20–38 knots | €1,429 | |
| Core | 2025 | 7 m² | — | 17–35 knots | €1,469 | |
| Core | 2025 | 8 m² | — | 15–33 knots | €1,539 | |
| Core | 2025 | 9 m² | — | 13–30 knots | €1,579 | |
| Core | 2025 | 10 m² | — | 12–28 knots | €1,649 | |
| Core | 2025 | 11 m² | — | 11–26 knots | €1,729 | |
| Core | 2025 | 12 m² | — | 10–24 knots | €1,769 | |
| Core | 2025 | 13.5 m² | — | 9–22 knots | €1,859 | |
| Core | 2025 | 15 m² | — | 8–20 knots | €2,009 | |
| Core | 2025 | 17 m² | — | 7–19 knots | €2,099 | |
| Core | ≈ 2026 | 5 m² | — | 22–42 knots | €1,799 | |
| Core | ≈ 2026 | 6 m² | — | 20–38 knots | €1,899 | |
| Core | ≈ 2026 | 7 m² | — | 17–35 knots | €1,949 | |
| Core | ≈ 2026 | 8 m² | — | 15–33 knots | €2,049 | |
| Core | ≈ 2026 | 9 m² | — | 13–30 knots | €2,099 | |
| Core | ≈ 2026 | 10 m² | — | 12–28 knots | €2,199 | |
| Core | ≈ 2026 | 11 m² | — | 11–26 knots | €2,299 | |
| Core | ≈ 2026 | 12 m² | — | 10–24 knots | €2,349 | |
| Core | ≈ 2026 | 13.5 m² | — | 9–22 knots | €2,479 | |
| Core | ≈ 2025 | 5 m² | — | 22–42 knots | €1,799 | |
| Core | ≈ 2025 | 6 m² | — | 20–38 knots | €1,899 | |
| Core | ≈ 2025 | 7 m² | — | 17–35 knots | €1,949 | |
| Core | ≈ 2025 | 8 m² | — | 15–33 knots | €2,049 | |
| Core | ≈ 2025 | 9 m² | — | 13–30 knots | €2,099 | |
| Core | ≈ 2025 | 10 m² | — | 12–28 knots | €2,199 | |
| Core | ≈ 2025 | 11 m² | — | 11–26 knots | €2,299 | |
| Core | ≈ 2025 | 12 m² | — | 10–24 knots | €2,349 | |
| Core | ≈ 2025 | 13.5 m² | — | 9–22 knots | €2,479 | |
| Core | ≈ 2026 | 6 m² | — | 20–42 knots | €2,849 | |
| Core | ≈ 2026 | 7 m² | — | 17–38 knots | €2,949 | |
| Core | ≈ 2026 | 8 m² | — | 15–36 knots | €3,049 | |
| Core | ≈ 2026 | 9 m² | — | 13–33 knots | €3,149 | |
| Core | ≈ 2026 | 10 m² | — | 12–30 knots | €3,249 | |
| Core | ≈ 2026 | 12 m² | — | 11–26 knots | €3,449 | |
| Core | ≈ 2024 | 5 m² | — | 22–42 knots | €1,699 | |
| Core | ≈ 2024 | 6 m² | — | 20–38 knots | €1,779 | |
| Core | ≈ 2024 | 7 m² | — | 17–35 knots | €1,849 | |
| Core | ≈ 2024 | 8 m² | — | 15–33 knots | €1,929 | |
| Core | ≈ 2024 | 9 m² | — | 13–30 knots | €1,999 | |
| Core | ≈ 2024 | 10 m² | — | 12–28 knots | €2,079 | |
| Core | ≈ 2024 | 12 m² | — | 10–24 knots | €2,249 | |
| Core | 2024 | 2 m² | — | 25–36 knots | €1,379 | |
| Core | 2024 | 3 m² | — | 22–34 knots | €1,429 | |
| Core | 2024 | 4 m² | — | 19–31 knots | €1,479 | |
| Core | 2024 | 5 m² | — | 15–29 knots | €1,579 | |
| Core | 2024 | 6 m² | — | 14–27 knots | €1,629 | |
| Core | 2024 | 7 m² | — | 12–24 knots | €1,679 | |
| Core | 2024 | 8 m² | — | 11–22 knots | €1,729 | |
| Core | 2024 | 9 m² | — | 10–20 knots | €1,799 | |
| Core | 2024 | 10 m² | — | 10–18 knots | €1,899 | |
| Core | 2024 | 11 m² | — | 9–16 knots | €1,999 | |
| Core | 2024 | 12 m² | — | 9–15 knots | €2,099 | |
| Core | 2024 | 13.5 m² | — | 8–14 knots | €2,199 | |
| Core | ≈ 2025 | 6 m² | — | 20–42 knots | €2,849 | |
| Core | ≈ 2025 | 7 m² | — | 17–38 knots | €2,949 | |
| Core | ≈ 2025 | 8 m² | — | 15–36 knots | €3,049 | |
| Core | ≈ 2025 | 9 m² | — | 13–33 knots | €3,149 | |
| Core | ≈ 2025 | 10 m² | — | 12–30 knots | €3,249 | |
| Core | ≈ 2025 | 12 m² | — | 11–26 knots | €3,449 | |
| Core | ≈ 2026 | 5 m² | — | 22–42 knots | €1,849 | |
| Core | ≈ 2026 | 6 m² | — | 20–38 knots | €1,949 | |
| Core | ≈ 2026 | 7 m² | — | 17–35 knots | €1,999 | |
| Core | ≈ 2026 | 8 m² | — | 15–33 knots | €2,099 | |
| Core | ≈ 2026 | 9 m² | — | 13–30 knots | €2,149 | |
| Core | ≈ 2026 | 10 m² | — | 12–28 knots | €2,249 | |
| Core | ≈ 2026 | 11 m² | — | 11–26 knots | €2,349 | |
| Core | ≈ 2026 | 12 m² | — | 10–24 knots | €2,399 | |
| Core | ≈ 2026 | 13.5 m² | — | 9–22 knots | €2,529 | |
| Duotone | 2027 | 6 m² | 2.09 kg | 20–39 knots | €1,869 | |
| Duotone | 2027 | 7 m² | 2.29 kg | 19–37 knots | €1,959 | |
| Duotone | 2027 | 8 m² | 2.44 kg | 17–35 knots | €2,039 | |
| Duotone | 2027 | 9 m² | 2.64 kg | 15–33 knots | €2,119 | |
| Duotone | 2027 | 10 m² | 2.82 kg | 13–31 knots | €2,199 | |
| Duotone | 2027 | 11 m² | 2.99 kg | 12–28 knots | €2,279 | |
| Duotone | 2027 | 12 m² | 3.2 kg | 11–25 knots | €2,369 | |
| Duotone | 2027 | 13 m² | 3.39 kg | 10–22 knots | €2,449 | |
| Duotone | 2026 | 7 m² | 2.29 kg | 19–37 knots | €1,343 | |
| Duotone | 2026 | 8 m² | 2.44 kg | 17–35 knots | €1,399 | |
| Duotone | 2026 | 9 m² | 2.64 kg | 15–33 knots | €1,455 | |
| Duotone | 2026 | 10 m² | 2.82 kg | 13–31 knots | €1,511 | |
| Duotone | 2026 | 11 m² | 2.99 kg | 12–28 knots | €1,567 | |
| Duotone | 2026 | 5 m² | 1.9 kg | 23–41 knots | €1,399 | |
| Duotone | 2026 | 6 m² | 2.1 kg | 21–40 knots | €1,479 | |
| Duotone | 2026 | 7 m² | 2.3 kg | 19–37 knots | €1,569 | |
| Duotone | 2026 | 8 m² | 2.54 kg | 17–35 knots | €1,649 | |
| Duotone | 2026 | 9 m² | 2.75 kg | 15–33 knots | €1,729 | |
| Duotone | 2026 | 10 m² | 2.91 kg | 13–31 knots | €1,809 | |
| Duotone | 2026 | 11 m² | 3.13 kg | 12–28 knots | €1,889 | |
| Duotone | 2026 | 12 m² | 3.3 kg | 11–26 knots | €1,969 | |
| Duotone | 2026 | 13 m² | 3.5 kg | 10–24 knots | €2,049 | |
| Duotone | 2027 | 6 m² | 1.89 kg | 19–42 knots | €2,599 | |
| Duotone | 2027 | 7 m² | 1.99 kg | 17–39 knots | €2,699 | |
| Duotone | 2027 | 8 m² | 2.1 kg | 15–37 knots | €2,799 | |
| Duotone | 2027 | 9 m² | 2.28 kg | 13–35 knots | €2,899 | |
| Duotone | 2027 | 10 m² | 2.43 kg | 11–33 knots | €2,999 | |
| Duotone | 2027 | 11 m² | 2.55 kg | 10–30 knots | €3,099 | |
| Duotone | 2027 | 12 m² | 2.7 kg | 9–28 knots | €3,199 | |
| Duotone | 2027 | 13 m² | 2.81 kg | 8–26 knots | €3,299 | |
| Duotone | 2026 | 6 m² | 1.89 kg | 19–42 knots | €1,784 | |
| Duotone | 2026 | 7 m² | 1.99 kg | 17–39 knots | €1,854 | |
| Duotone | 2026 | 8 m² | 2.1 kg | 15–37 knots | €1,924 | |
| Duotone | 2027 | 7 m² | 2.26 kg | 18–38 knots | €1,959 | |
| Duotone | 2027 | 8 m² | 2.44 kg | 16–36 knots | €2,039 | |
| Duotone | 2027 | 9 m² | 2.63 kg | 14–34 knots | €2,119 | |
| Duotone | 2027 | 10 m² | 2.81 kg | 12–32 knots | €2,199 | |
| Duotone | 2027 | 11 m² | 3 kg | 11–29 knots | €2,279 | |
| Duotone | 2027 | 12 m² | 3.24 kg | 10–27 knots | €2,359 | |
| Duotone | 2027 | 13 m² | 3.44 kg | 9–25 knots | €2,439 | |
| Duotone | 2026 | 9 m² | 2.63 kg | 14–34 knots | €1,455 | |
| Duotone | 2026 | 14 m² | 3.32 kg | 9–18 knots | €2,319 | |
| Duotone | 2026 | 15 m² | 3.5 kg | 9–18 knots | €2,399 | |
| Duotone | 2026 | 17 m² | 3.75 kg | 9–18 knots | €2,559 | |
| Duotone | 2026 | 14 m² | 2.99 kg | 7–18 knots | €3,399 | |
| Duotone | 2026 | 15 m² | 3.1 kg | 7–18 knots | €3,499 | |
| Duotone | 2026 | 17 m² | 3.3 kg | 7–18 knots | €3,699 | |
| Duotone | 2026 | 3.5 m² | 1.32 kg | 27–41 knots | €1,149 | |
| Duotone | 2026 | 5 m² | 1.68 kg | 23–37 knots | €1,249 | |
| Duotone | 2026 | 7 m² | 2 kg | 19–33 knots | €1,409 | |
| Duotone | 2026 | 9 m² | 2.34 kg | 16–30 knots | €1,579 | |
| Duotone | 2026 | 11 m² | 2.6 kg | 14–25 knots | €1,739 | |
| Duotone | 2026 | 13 m² | 2.9 kg | 11–21 knots | €1,899 | |
| Duotone | 2026 | 15 m² | 3.4 kg | 9–18 knots | €2,109 | |
| Duotone | 2025 | 3.5 m² | — | 27–41 knots | €804 | |
| Duotone | 2025 | 11 m² | — | 14–25 knots | €1,217 | |
| Duotone | 2027 | 3 m² | 1.6 kg | 29–42 knots | €1,249 | |
| Duotone | 2027 | 4 m² | 1.85 kg | 26–40 knots | €1,329 | |
| Duotone | 2027 | 5 m² | 2.05 kg | 23–38 knots | €1,409 | |
| Duotone | 2027 | 6 m² | 2.25 kg | 21–36 knots | €1,489 | |
| Duotone | 2027 | 7 m² | 2.4 kg | 19–34 knots | €1,579 | |
| Duotone | 2027 | 8 m² | 2.65 kg | 17–32 knots | €1,669 | |
| Duotone | 2027 | 9 m² | 2.8 kg | 15–30 knots | €1,749 | |
| Duotone | 2027 | 10 m² | 3 kg | 13–28 knots | €1,829 | |
| Duotone | 2027 | 11 m² | 3.15 kg | 12–25 knots | €1,909 | |
| Duotone | 2027 | 12 m² | 3.35 kg | 11–22 knots | €1,989 | |
| Duotone | 2026 | 7 m² | 2.4 kg | 19–34 knots | €1,098 | |
| Duotone | 2026 | 8 m² | 2.65 kg | 17–32 knots | €1,154 | |
| Duotone | 2026 | 9 m² | 2.8 kg | 15–30 knots | €1,210 | |
| Duotone | 2026 | 10 m² | 3 kg | 13–28 knots | €1,266 | |
| Duotone | 2026 | 11 m² | 3.15 kg | 12–25 knots | €1,322 | |
| Duotone | 2026 | 12 m² | 3.35 kg | 11–22 knots | €1,378 | |
| Duotone | 2026 | 7 m² | 2.2 kg | 17–36 knots | €2,699 | |
| Duotone | 2026 | 8 m² | 2.4 kg | 15–34 knots | €2,799 | |
| Duotone | 2026 | 9 m² | 2.57 kg | 13–32 knots | €2,899 | |
| Duotone | 2026 | 10 m² | 2.73 kg | 11–30 knots | €2,999 | |
| Duotone | 2026 | 11 m² | 2.88 kg | 10–27 knots | €3,099 | |
| Duotone | 2026 | 12 m² | 3.05 kg | 9–22 knots | €3,199 | |
| Duotone | 2027 | 5 m² | 1.97 kg | 24–40 knots | €1,779 | |
| Duotone | 2027 | 6 m² | 2.16 kg | 20–37 knots | €1,869 | |
| Duotone | 2027 | 7 m² | 2.35 kg | 18–35 knots | €1,959 | |
| Duotone | 2027 | 8 m² | 2.53 kg | 16–33 knots | €2,039 | |
| Duotone | 2027 | 9 m² | 2.69 kg | 14–31 knots | €2,119 | |
| Duotone | 2027 | 10 m² | 2.9 kg | 12–29 knots | €2,199 | |
| Duotone | 2027 | 11 m² | 3.01 kg | 11–26 knots | €2,279 | |
| Duotone | 2027 | 12 m² | 3.19 kg | 10–23 knots | €2,369 | |
| Duotone | 2026 | 6 m² | 2.15 kg | 20–41 knots | €2,899 | |
| Duotone | 2026 | 7 m² | 2.3 kg | 18–39 knots | €2,999 | |
| Duotone | 2026 | 8 m² | 2.5 kg | 17–37 knots | €3,099 | |
| Duotone | 2026 | 9 m² | 2.7 kg | 16–35 knots | €3,199 | |
| Duotone | 2026 | 10 m² | 2.9 kg | 12–33 knots | €3,299 | |
| Duotone | 2026 | 11 m² | 3 kg | 11–31 knots | €3,399 | |
| Duotone | 2026 | 12 m² | 3.1 kg | 10–27 knots | €3,499 | |
| Duotone | 2026 | 13 m² | 3.3 kg | 9–25 knots | €3,599 | |
| Duotone | 2025 | 6 m² | 2.2 kg | 20–41 knots | €1,994 | |
| Duotone | 2027 | 6 m² | 2.44 kg | 21–40 knots | €2,089 | |
| Duotone | 2027 | 7 m² | 2.65 kg | 19–38 knots | €2,169 | |
| Duotone | 2027 | 8 m² | 2.84 kg | 17–36 knots | €2,249 | |
| Duotone | 2027 | 9 m² | 3.03 kg | 15–34 knots | €2,329 | |
| Duotone | 2027 | 10 m² | 3.26 kg | 13–32 knots | €2,429 | |
| Duotone | 2027 | 11 m² | 3.43 kg | 12–29 knots | €2,509 | |
| Duotone | 2027 | 12 m² | 3.61 kg | 11–26 knots | €2,589 | |
| Duotone | 2027 | 13 m² | 3.83 kg | 10–24 knots | €2,669 | |
| Duotone | 2027 | 14 m² | 3.99 kg | 9–22 knots | €2,749 | |
| Duotone | 2026 | 6 m² | 2.44 kg | 21–40 knots | €1,434 | |
| Duotone | 2026 | 7 m² | 2.71 kg | 21–36 knots | €1,749 | |
| Duotone | 2026 | 8 m² | 2.9 kg | 19–34 knots | €1,829 | |
| Duotone | 2026 | 9 m² | 3.16 kg | 17–32 knots | €1,909 | |
| Duotone | 2026 | 10 m² | 3.39 kg | 15–30 knots | €1,999 | |
| Duotone | 2026 | 11 m² | 3.58 kg | 14–27 knots | €2,079 | |
| Duotone | 2026 | 12 m² | 3.81 kg | 13–24 knots | €2,159 | |
| Duotone | 2026 | 13 m² | 4.02 kg | 12–21 knots | €2,239 | |
| Eleveight | ≈ 2025 | 8 m² | 2.96 kg | 18–32 knots | €1,539 | |
| Eleveight | ≈ 2025 | 9 m² | 3.15 kg | 16–30 knots | €1,599 | |
| Eleveight | ≈ 2025 | 10 m² | 3.34 kg | 12–28 knots | €1,659 | |
| Eleveight | ≈ 2025 | 12 m² | 3.73 kg | 10–24 knots | €1,749 | |
| Eleveight | ≈ 2025 | 14 m² | 3.97 kg | 8–22 knots | €1,899 | |
| Eleveight | ≈ 2025 | 12 m² | 2.75 kg | 8–20 knots | €1,569 | |
| Eleveight | ≈ 2025 | 14 m² | 3.09 kg | 6–18 knots | €1,689 | |
| Eleveight | ≈ 2026 | 4 m² | 1.89 kg | 26–40+ knots | €969 | |
| Eleveight | ≈ 2026 | 6 m² | 2.36 kg | 22–36 knots | €1,019 | |
| Eleveight | ≈ 2026 | 8 m² | 2.81 kg | 18–30 knots | €1,069 | |
| Eleveight | ≈ 2026 | 10 m² | 3.22 kg | 14–26 knots | €969 | |
| Eleveight | ≈ 2026 | 12 m² | 3.52 kg | 10–22 knots | €1,269 | |
| Eleveight | ≈ 2026 | 14 m² | 3.9 kg | 6–18 knots | €1,339 | |
| Eleveight | ≈ 2025 | 7 m² | 2.12 kg | 18–32 knots | €2,369 | |
| Eleveight | ≈ 2025 | 8 m² | 2.3 kg | 16–30 knots | €2,469 | |
| Eleveight | ≈ 2025 | 9 m² | 2.48 kg | 14–28 knots | €2,569 | |
| Eleveight | ≈ 2025 | 10 m² | 2.61 kg | 12–26 knots | €2,669 | |
| Eleveight | ≈ 2025 | 12 m² | 2.89 kg | 10–24 knots | €2,769 | |
| Eleveight | ≈ 2026 | 5 m² | 2 kg | 24–41+ knots | €1,339 | |
| Eleveight | ≈ 2026 | 6 m² | 2.2 kg | 22–40 knots | €1,419 | |
| Eleveight | ≈ 2026 | 7 m² | 2.43 kg | 20–36 knots | €1,479 | |
| Eleveight | ≈ 2026 | 8 m² | 2.61 kg | 18–34 knots | €1,549 | |
| Eleveight | ≈ 2026 | 9 m² | 2.8 kg | 16–32 knots | €1,589 | |
| Eleveight | ≈ 2026 | 10 m² | 3.12 kg | 13–28 knots | €1,339 | |
| Eleveight | ≈ 2026 | 12 m² | 3.36 kg | 11–24 knots | €1,759 | |
| Eleveight | ≈ 2026 | 14 m² | 3.62 kg | 8–20 knots | €1,849 | |
| Eleveight | ≈ 2026 | 17 m² | 4.14 kg | 6–17 knots | €1,989 | |
| Eleveight | ≈ 2026 | 6 m² | 2.16 kg | 20–40+ knots | €1,769 | |
| Eleveight | ≈ 2026 | 7 m² | 2.36 kg | 18–36 knots | €1,819 | |
| Eleveight | ≈ 2026 | 8 m² | 2.54 kg | 16–34 knots | €1,859 | |
| Eleveight | ≈ 2026 | 9 m² | 2.72 kg | 14–32 knots | €1,909 | |
| Eleveight | ≈ 2026 | 10 m² | 2.88 kg | 10–30 knots | €1,989 | |
| Eleveight | ≈ 2026 | 12 m² | 3.29 kg | 8–26 knots | €2,029 | |
| Eleveight | ≈ 2026 | 14 m² | 3.6 kg | 6–22 knots | €2,129 | |
| Eleveight | ≈ 2026 | 6 m² | 2.57 kg | 20–40+ knots | €1,789 | |
| Eleveight | ≈ 2026 | 7 m² | 2.78 kg | 18–37 knots | €1,829 | |
| Eleveight | ≈ 2026 | 8 m² | 2.96 kg | 17–35 knots | €1,869 | |
| Eleveight | ≈ 2026 | 9 m² | 3.15 kg | 15–33 knots | €1,919 | |
| Eleveight | ≈ 2026 | 10 m² | 3.35 kg | 13–30 knots | €1,999 | |
| Eleveight | ≈ 2026 | 12 m² | 3.73 kg | 11–26 knots | €2,069 | |
| Eleveight | ≈ 2026 | 5 m² | 1.99 kg | 20–36 knots | €1,339 | |
| Eleveight | ≈ 2026 | 6 m² | 2.19 kg | 18–34 knots | €1,399 | |
| Eleveight | ≈ 2026 | 7 m² | 2.41 kg | 16–31 knots | €1,459 | |
| Eleveight | ≈ 2026 | 8 m² | 2.58 kg | 14–28 knots | €1,529 | |
| Eleveight | ≈ 2026 | 9 m² | 2.73 kg | 12–25 knots | €1,569 | |
| Eleveight | ≈ 2026 | 11 m² | 3.21 kg | 10–23 knots | €1,649 | |
| F-One | ≈ 2027 | 3.5 m² | 1.65 kg | 40+ knots | €1,260* | |
| F-One | ≈ 2027 | 4 m² | 1.7 kg | 30+ knots | €1,320* | |
| F-One | ≈ 2027 | 5 m² | 1.89 kg | 25+ knots | €1,380* | |
| F-One | ≈ 2027 | 6 m² | 2.04 kg | 23+ knots | €1,440* | |
| F-One | ≈ 2027 | 7 m² | 2.23 kg | 20+ knots | €1,520* | |
| F-One | ≈ 2027 | 8 m² | 2.4 kg | 16–25 knots | €1,600* | |
| F-One | ≈ 2027 | 9 m² | 2.6 kg | 14–22 knots | €1,680* | |
| F-One | ≈ 2027 | 10 m² | 2.82 kg | 12–22 knots | €1,760* | |
| F-One | ≈ 2027 | 11 m² | 3 kg | 10–20 knots | €1,840* | |
| F-One | ≈ 2027 | 12 m² | 3.2 kg | 9–20 knots | €1,940* | |
| F-One | ≈ 2026 | 6 m² | — | 30+ knots | €1,290* | |
| F-One | ≈ 2026 | 7 m² | — | 25+ knots | €1,340* | |
| F-One | ≈ 2026 | 8 m² | — | 25–35 knots | €1,390* | |
| F-One | ≈ 2026 | 9 m² | — | 15–30 knots | €1,490* | |
| F-One | ≈ 2026 | 10 m² | — | 12–26 knots | €1,590* | |
| F-One | ≈ 2026 | 12 m² | — | 11–24 knots | €1,690* | |
| F-One | ≈ 2026 | 14 m² | — | 8–18 knots | €1,740* | |
| F-One | ≈ 2026 | 6 m² | 1.98 kg | 25–40 knots | €1,890* | |
| F-One | ≈ 2026 | 7 m² | 2.14 kg | 23–40 knots | €1,990* | |
| F-One | ≈ 2026 | 8 m² | 2.31 kg | 20–35 knots | €2,090* | |
| F-One | ≈ 2026 | 9 m² | 2.47 kg | 15–30 knots | €2,190* | |
| F-One | ≈ 2026 | 10 m² | 2.67 kg | 12–26 knots | €2,290* | |
| F-One | ≈ 2026 | 11 m² | 2.79 kg | 11–24 knots | €2,390* | |
| F-One | ≈ 2026 | 12 m² | 2.92 kg | 10–22 knots | €2,490* | |
| F-One | ≈ 2026 | 14 m² | 3.26 kg | 8–20 knots | €2,740* | |
| F-One | ≈ 2026 | 5 m² | 1.86 kg | 26–45+ knots | €1,790* | |
| F-One | ≈ 2026 | 6 m² | 1.97 kg | 24–45 knots | €1,890* | |
| F-One | ≈ 2026 | 7 m² | 2.16 kg | 22–40 knots | €1,990* | |
| F-One | ≈ 2026 | 8 m² | 2.31 kg | 19–35 knots | €2,090* | |
| F-One | ≈ 2026 | 9 m² | 2.47 kg | 17–32 knots | €2,190* | |
| F-One | ≈ 2026 | 10 m² | 2.64 kg | 15–30 knots | €2,290* | |
| F-One | ≈ 2026 | 12 m² | 2.99 kg | 12–24 knots | €2,490* | |
| F-One | ≈ 2026 | 5 m² | 1.57 kg | 24–38 knots | €1,190* | |
| F-One | ≈ 2026 | 7 m² | 1.97 kg | 20–32 knots | €1,360* | |
| F-One | ≈ 2026 | 9 m² | 2.27 kg | 16–26 knots | €1,510* | |
| F-One | ≈ 2026 | 11 m² | 2.67 kg | 12–22 knots | €1,650* | |
| F-One | ≈ 2026 | 13 m² | 2.97 kg | 8–18 knots | €1,790* | |
| F-One | ≈ 2026 | 15 m² | 3.27 kg | 8–16 knots | €1,930* | |
| F-One | ≈ 2026 | 17 m² | 3.57 kg | 8–14 knots | €2,060* | |
| F-One | ≈ 2026 | 5 m² | 2.06 kg | 36+ knots | €2,050* | |
| F-One | ≈ 2026 | 6 m² | 2.27 kg | 32+ knots | €2,110* | |
| F-One | ≈ 2026 | 7 m² | 2.48 kg | 29+ knots | €2,210* | |
| F-One | ≈ 2026 | 8 m² | 2.66 kg | 24+ knots | €2,310* | |
| F-One | ≈ 2026 | 9 m² | 2.81 kg | 19–35 knots | €2,370* | |
| F-One | ≈ 2026 | 10 m² | 2.97 kg | 16–30 knots | €2,430* | |
| F-One | ≈ 2026 | 11 m² | 3.13 kg | 14–23 knots | €2,530* | |
| F-One | ≈ 2026 | 12 m² | 3.3 kg | 12–21 knots | €2,640* | |
| F-One | ≈ 2025 | 6 m² | 2.43 kg | 32+ knots | €1,490* | |
| F-One | ≈ 2025 | 7 m² | 2.6 kg | 29+ knots | €1,590* | |
| F-One | ≈ 2025 | 8 m² | 2.84 kg | 24+ knots | €1,690* | |
| F-One | ≈ 2025 | 9 m² | 3 kg | 19–35 knots | €1,750* | |
| F-One | ≈ 2025 | 10 m² | 3.14 kg | 16–30 knots | €1,850* | |
| F-One | ≈ 2025 | 11 m² | 3.33 kg | 14–23 knots | €1,950* | |
| F-One | ≈ 2025 | 12 m² | 3.46 kg | 12–21 knots | €1,990* | |
| Flysurfer | 2026 | 6 m² | — | 25–37 knots | €1,499 | |
| Flysurfer | 2026 | 7 m² | — | 24–30 knots | €1,599 | |
| Flysurfer | 2026 | 8 m² | — | 22–29 knots | €1,699 | |
| Flysurfer | 2026 | 9 m² | — | 17–26 knots | €1,799 | |
| Flysurfer | 2026 | 10 m² | — | 16–25 knots | €1,899 | |
| Flysurfer | 2026 | 12 m² | — | 12–21 knots | €1,999 | |
| Flysurfer | 2026 | 6 m² | 2.3 kg | 24–34 knots | €1,399 | |
| Flysurfer | 2026 | 7 m² | 2.45 kg | 21–29 knots | €1,499 | |
| Flysurfer | 2026 | 8 m² | 2.8 kg | 19–27 knots | €1,599 | |
| Flysurfer | 2026 | 9 m² | 2.9 kg | 17–25 knots | €1,699 | |
| Flysurfer | 2026 | 12 m² | 3.6 kg | 11–20 knots | €1,899 | |
| Flysurfer | 2026 | 15 m² | 4.12 kg | 10–16 knots | €2,099 | |
| Flysurfer | 2026 | 3 m² | 0.56 kg | 18–32 knots | €929 | |
| Flysurfer | 2026 | 4.5 m² | 0.74 kg | 15–28 knots | €1,029 | |
| Flysurfer | 2026 | 6 m² | 0.9 kg | 12–22 knots | €1,229 | |
| Flysurfer | 2026 | 8 m² | 1.12 kg | 10–18 knots | €1,429 | |
| Flysurfer | 2026 | 10 m² | 1.42 kg | 8–15 knots | €1,579 | |
| Flysurfer | 2026 | 12 m² | 1.56 kg | 8–13 knots | €1,679 | |
| Flysurfer | 2026 | 9 m² | 2.55 kg | 17–29 knots | €1,149 | |
| Flysurfer | 2026 | 11 m² | 2.85 kg | 15–27 knots | €1,249 | |
| Flysurfer | 2026 | 13 m² | 3.2 kg | 12–24 knots | €1,449 | |
| Flysurfer | 2026 | 15 m² | 3.6 kg | 10–18 knots | €1,649 | |
| Flysurfer | 2026 | 2.5 m² | 0.48 kg | 18–32 knots | €619 | |
| Flysurfer | 2026 | 4 m² | 0.64 kg | 15–28 knots | €719 | |
| Flysurfer | 2026 | 5 m² | 0.78 kg | 12–22 knots | €819 | |
| Flysurfer | 2026 | 6 m² | 0.88 kg | 10–18 knots | €869 | |
| Flysurfer | 2026 | 8 m² | 1.06 kg | 8–15 knots | €919 | |
| Flysurfer | 2026 | 11 m² | 1.36 kg | 6–11 knots | €1,019 | |
| Flysurfer | 2026 | 7 m² | 1.42 kg | 15–28 knots | €2,249 | |
| Flysurfer | 2026 | 10 m² | 1.84 kg | 11–23 knots | €2,449 | |
| Flysurfer | 2026 | 12 m² | 2.18 kg | 10–19 knots | €2,649 | |
| Flysurfer | 2026 | 15 m² | 2.64 kg | 8–15 knots | €2,899 | |
| Flysurfer | 2026 | 7 m² | 1.52 kg | 18–31 knots | €1,799 | |
| Flysurfer | 2026 | 10 m² | 1.98 kg | 13–25 knots | €2,099 | |
| Flysurfer | 2026 | 12 m² | 2.3 kg | 10–22 knots | €2,199 | |
| Flysurfer | 2026 | 15 m² | 2.78 kg | 8–18 knots | €2,399 | |
| Flysurfer | 2026 | 18 m² | 3.26 kg | 7–16 knots | €2,599 | |
| Flysurfer | 2026 | 4 m² | 1.62 kg | 28–38 knots | €1,149 | |
| Flysurfer | 2026 | 5 m² | 1.82 kg | 24–34 knots | €1,249 | |
| Flysurfer | 2026 | 6 m² | 2.06 kg | 22–30 knots | €1,379 | |
| Flysurfer | 2026 | 7 m² | 2.3 kg | 20–27 knots | €1,479 | |
| Flysurfer | 2026 | 8 m² | 2.45 kg | 18–25 knots | €1,529 | |
| Flysurfer | 2026 | 9 m² | 2.66 kg | 17–23 knots | €1,579 | |
| Flysurfer | 2026 | 10 m² | 2.86 kg | 15–22 knots | €1,679 | |
| Flysurfer | 2026 | 12 m² | 3.38 kg | 13–19 knots | €1,779 | |
| Flysurfer | 2026 | 12 m² | 1.74 kg | 11–22 knots | €2,999 | |
| Flysurfer | 2026 | 15 m² | 2.16 kg | 7–18 knots | €3,199 | |
| Flysurfer | 2026 | 19 m² | 2.46 kg | 6–15 knots | €3,499 | |
| Flysurfer | 2026 | 22 m² | 2.78 kg | 5–12 knots | €3,699 | |
| Flysurfer | 2026 | 9 m² | 1.75 kg | 12–30 knots | €3,449 | |
| Flysurfer | 2026 | 11 m² | 2.12 kg | 9–24 knots | €3,749 | |
| Flysurfer | 2026 | 15 m² | 2.42 kg | 8–18 knots | €4,049 | |
| Flysurfer | 2026 | 19 m² | 2.88 kg | 5–14 knots | €4,249 | |
| Flysurfer | 2026 | 21 m² | 3.12 kg | 5–13 knots | €4,449 | |
| GONG | 2026 | 5 m² | 2.56 kg | 18–30 knots | €519* | |
| GONG | 2026 | 6 m² | 2.75 kg | 16–29 knots | €545* | |
| GONG | 2026 | 7 m² | 2.97 kg | 14–28 knots | €575* | |
| GONG | 2026 | 8 m² | 3.23 kg | 12–25 knots | €605* | |
| GONG | 2026 | 9 m² | 3.5 kg | 10–22 knots | €639* | |
| GONG | 2026 | 10 m² | 3.75 kg | 9–21 knots | €675* | |
| GONG | 2026 | 11 m² | 4 kg | 8–20 knots | €709* | |
| GONG | 2026 | 12 m² | 4.29 kg | 7–19 knots | €745* | |
| GONG | 2026 | 5 m² | 2.1 kg | 18–30 knots | €739* | |
| GONG | 2026 | 6 m² | 2.43 kg | 16–29 knots | €805* | |
| GONG | 2026 | 7 m² | 2.76 kg | 14–28 knots | €869* | |
| GONG | 2026 | 8 m² | 2.93 kg | 12–25 knots | €935* | |
| GONG | 2026 | 9 m² | 3.1 kg | 10–22 knots | €999* | |
| GONG | 2026 | 10 m² | 3.33 kg | 9–21 knots | €1,059* | |
| GONG | 2026 | 11 m² | 3.54 kg | 8–20 knots | €1,125* | |
| GONG | 2026 | 12 m² | 3.75 kg | 7–19 knots | €1,189* | |
| GONG | 2026 | 5 m² | 2.2 kg | 18–30 knots | €789* | |
| GONG | 2026 | 6 m² | 2.65 kg | 16–29 knots | €855* | |
| GONG | 2026 | 7 m² | 3.07 kg | 14–28 knots | €919* | |
| GONG | 2026 | 8 m² | 3.3 kg | 12–25 knots | €979* | |
| GONG | 2026 | 9 m² | 3.53 kg | 10–22 knots | €1,045* | |
| GONG | 2026 | 10 m² | 3.8 kg | 9–21 knots | €1,109* | |
| GONG | 2026 | 11 m² | 4 kg | 8–20 knots | €1,175* | |
| GONG | 2026 | 12 m² | 4.2 kg | 8–19 knots | €1,239* | |
| GONG | 2026 | 7 m² | 2.75 kg | 14–28 knots | €479* | |
| GONG | 2026 | 8 m² | 2.98 kg | 12–25 knots | €509* | |
| GONG | 2026 | 9 m² | 3.22 kg | 10–22 knots | €535* | |
| GONG | 2026 | 10 m² | 3.45 kg | 9–21 knots | €559* | |
| GONG | 2026 | 11 m² | 3.7 kg | 8–20 knots | €579* | |
| GONG | 2026 | 12 m² | 3.99 kg | 7–19 knots | €615* | |
| GONG | 2026 | 13 m² | 4.15 kg | 6–17 knots | €655* | |
| GONG | 2026 | 4 m² | 2.1 kg | 19–33 knots | €469* | |
| GONG | 2026 | 5 m² | 2.38 kg | 18–30 knots | €499* | |
| GONG | 2026 | 6 m² | 2.53 kg | 16–29 knots | €529* | |
| GONG | 2026 | 7 m² | 2.75 kg | 14–28 knots | €559* | |
| GONG | 2026 | 8 m² | 2.99 kg | 12–25 knots | €585* | |
| GONG | 2026 | 9 m² | 3.24 kg | 10–22 knots | €615* | |
| GONG | 2026 | 10 m² | 3.55 kg | 9–21 knots | €649* | |
| GONG | 2026 | 11 m² | 3.75 kg | 8–20 knots | €685* | |
| GONG | 2026 | 12 m² | 3.95 kg | 7–19 knots | €719* | |
| GONG | 2026 | 4 m² | 1.89 kg | 19–33 knots | €639* | |
| GONG | 2026 | 5 m² | 2.11 kg | 18–30 knots | €699* | |
| GONG | 2026 | 6 m² | 2.31 kg | 16–29 knots | €765* | |
| GONG | 2026 | 7 m² | 2.49 kg | 14–28 knots | €829* | |
| GONG | 2026 | 8 m² | 2.67 kg | 12–25 knots | €895* | |
| GONG | 2026 | 9 m² | 2.85 kg | 10–22 knots | €959* | |
| GONG | 2026 | 10 m² | 3.16 kg | 9–21 knots | €1,019* | |
| GONG | 2026 | 11 m² | 3.45 kg | 8–20 knots | €1,085* | |
| GONG | 2026 | 12 m² | 3.65 kg | 7–19 knots | €1,149* | |
| GONG | 2026 | 4 m² | 1.9 kg | 17–29 knots | €375* | |
| GONG | 2026 | 5 m² | 2 kg | 16–24 knots | €405* | |
| GONG | 2026 | 6 m² | 2.15 kg | 14–23 knots | €435* | |
| GONG | 2026 | 7 m² | 2.26 kg | 12–22 knots | €459* | |
| GONG | 2026 | 8 m² | 2.38 kg | 10–19 knots | €489* | |
| GONG | 2026 | 9 m² | 2.5 kg | 8–16 knots | €519* | |
| GONG | 2026 | 10 m² | 2.75 kg | 7–15 knots | €555* | |
| GONG | 2026 | 11 m² | 3 kg | 6–14 knots | €589* | |
| GONG | 2026 | 12 m² | 3.27 kg | 6–13 knots | €625* | |
| GONG | 2026 | 13 m² | 3.6 kg | 5–12 knots | €659* | |
| GONG | 2026 | 15 m² | 4 kg | 5–11 knots | €699* | |
| GONG | 2026 | 17 m² | 4.7 kg | 5–9 knots | €735* | |
| GONG | 2026 | 4 m² | 1.54 kg | 17–29 knots | €519* | |
| GONG | 2026 | 5 m² | 1.7 kg | 16–24 knots | €579* | |
| GONG | 2026 | 6 m² | 1.9 kg | 14–23 knots | €645* | |
| GONG | 2026 | 7 m² | 2.1 kg | 12–22 knots | €709* | |
| GONG | 2026 | 8 m² | 2.3 kg | 10–19 knots | €775* | |
| GONG | 2026 | 9 m² | 2.4 kg | 8–16 knots | €839* | |
| GONG | 2026 | 10 m² | 2.6 kg | 7–15 knots | €899* | |
| GONG | 2026 | 11 m² | 2.8 kg | 6–14 knots | €965* | |
| GONG | 2026 | 12 m² | 2.9 kg | 6–13 knots | €1,029* | |
| GONG | 2026 | 13 m² | 3.2 kg | 5–12 knots | €1,095* | |
| GONG | 2026 | 15 m² | 3.5 kg | 5–11 knots | €1,159* | |
| GONG | 2026 | 17 m² | 3.8 kg | 5–9 knots | €1,219* | |
| GONG | 2026 | 4 m² | 2.14 kg | 18–33 knots | €415* | |
| GONG | 2026 | 5 m² | 2.24 kg | 17–28 knots | €445* | |
| GONG | 2026 | 6 m² | 2.35 kg | 15–27 knots | €475* | |
| GONG | 2026 | 7 m² | 2.4 kg | 13–26 knots | €499* | |
| GONG | 2026 | 8 m² | 2.58 kg | 11–23 knots | €529* | |
| GONG | 2026 | 9 m² | 2.77 kg | 9–20 knots | €559* | |
| GONG | 2026 | 10 m² | 2.97 kg | 8–19 knots | €595* | |
| GONG | 2026 | 11 m² | 3.2 kg | 7–18 knots | €629* | |
| GONG | 2026 | 12 m² | 3.43 kg | 6–17 knots | €665* | |
| GONG | 2026 | 13 m² | 3.67 kg | 6–16 knots | €699* | |
| GONG | 2026 | 14 m² | 3.95 kg | 5–15 knots | €739* | |
| GONG | 2026 | 4 m² | 1.6 kg | 18–33 knots | €559* | |
| GONG | 2026 | 5 m² | 1.8 kg | 17–28 knots | €619* | |
| GONG | 2026 | 6 m² | 1.99 kg | 15–27 knots | €685* | |
| GONG | 2026 | 7 m² | 2.2 kg | 13–26 knots | €749* | |
| GONG | 2026 | 8 m² | 2.4 kg | 11–23 knots | €815* | |
| GONG | 2026 | 9 m² | 2.5 kg | 9–20 knots | €879* | |
| GONG | 2026 | 10 m² | 2.7 kg | 8–19 knots | €939* | |
| GONG | 2026 | 11 m² | 2.98 kg | 7–18 knots | €1,005* | |
| GONG | 2026 | 12 m² | 3.1 kg | 6–17 knots | €1,069* | |
| GONG | 2026 | 13 m² | 3.3 kg | 6–16 knots | €1,135* | |
| GONG | 2026 | 14 m² | 3.5 kg | 5–15 knots | €1,199* | |
| GONG | 2026 | 16 m² | 3.7 kg | 5–13 knots | €1,259* | |
| GONG | 2026 | 5 m² | 2.35 kg | 18–30 knots | €499* | |
| GONG | 2026 | 6 m² | 2.5 kg | 16–29 knots | €529* | |
| GONG | 2026 | 7 m² | 2.72 kg | 14–28 knots | €559* | |
| GONG | 2026 | 8 m² | 2.95 kg | 12–25 knots | €585* | |
| GONG | 2026 | 9 m² | 3.18 kg | 10–22 knots | €615* | |
| GONG | 2026 | 10 m² | 3.4 kg | 9–21 knots | €649* | |
| GONG | 2026 | 11 m² | 3.67 kg | 8–20 knots | €685* | |
| GONG | 2026 | 12 m² | 3.88 kg | 7–19 knots | €719* | |
| GONG | 2026 | 14 m² | 4.2 kg | 6–17 knots | €759* | |
| GONG | 2026 | 5 m² | 1.95 kg | 18–30 knots | €699* | |
| GONG | 2026 | 6 m² | 2.25 kg | 16–29 knots | €765* | |
| GONG | 2026 | 7 m² | 2.45 kg | 14–28 knots | €829* | |
| GONG | 2026 | 8 m² | 2.65 kg | 12–25 knots | €895* | |
| GONG | 2026 | 9 m² | 2.8 kg | 10–22 knots | €959* | |
| GONG | 2026 | 10 m² | 3.03 kg | 9–21 knots | €1,019* | |
| GONG | 2026 | 11 m² | 3.26 kg | 8–20 knots | €1,085* | |
| GONG | 2026 | 12 m² | 3.5 kg | 7–19 knots | €1,149* | |
| GONG | 2026 | 14 m² | 3.85 kg | 6–17 knots | €1,215* | |
| GONG | 2026 | 5 m² | 2.05 kg | 18–30 knots | €749* | |
| GONG | 2026 | 6 m² | 2.39 kg | 16–29 knots | €815* | |
| GONG | 2026 | 7 m² | 2.72 kg | 14–28 knots | €879* | |
| GONG | 2026 | 8 m² | 2.92 kg | 12–25 knots | €939* | |
| GONG | 2026 | 9 m² | 3.12 kg | 10–22 knots | €1,005* | |
| GONG | 2026 | 10 m² | 3.35 kg | 9–21 knots | €1,069* | |
| GONG | 2026 | 11 m² | 3.56 kg | 8–20 knots | €1,135* | |
| GONG | 2026 | 12 m² | 4 kg | 7–19 knots | €1,199* | |
| GONG | 2026 | 14 m² | 4.75 kg | 6–17 knots | €1,259* | |
| Naish | 2025 | 2.8 m² | — | 30+ knots | €1,049 | |
| Naish | 2025 | 3.4 m² | — | 30+ knots | €1,099 | |
| Naish | 2025 | 4 m² | — | 30+ knots | €1,199 | |
| Naish | 2025 | 5 m² | — | 20+ knots | €1,249 | |
| Naish | 2025 | 6 m² | — | 25+ knots | €1,399 | |
| Naish | 2025 | 7 m² | — | 21+ knots | €1,449 | |
| Naish | 2025 | 8 m² | — | 18–32 knots | €1,549 | |
| Naish | 2025 | 9 m² | — | 18–30 knots | €1,599 | |
| Naish | 2025 | 10 m² | — | 15–26 knots | €1,699 | |
| Naish | 2025 | 11 m² | — | 14–24 knots | €1,749 | |
| Naish | 2025 | 12 m² | — | 11–22 knots | €1,849 | |
| Naish | 2025 | 14 m² | — | 9–19 knots | €1,949 | |
| Naish | 2025 | 16 m² | — | 8–18 knots | €2,099 | |
| Naish | 2026 | 4 m² | — | 26+ knots | €1,199 | |
| Naish | 2026 | 5 m² | — | 24–39 knots | €1,299 | |
| Naish | 2026 | 6 m² | — | 22–37 knots | €1,379 | |
| Naish | 2026 | 7 m² | — | 21–35 knots | €1,479 | |
| Naish | 2026 | 8 m² | — | 18–33 knots | €1,579 | |
| Naish | 2026 | 9 m² | — | 16–30 knots | €1,599 | |
| Naish | 2026 | 10 m² | — | 14–28 knots | €1,699 | |
| Naish | 2026 | 11 m² | — | 13–26 knots | €1,799 | |
| Naish | 2026 | 12 m² | — | 12–24 knots | €1,899 | |
| Naish | 2026 | 14 m² | — | 11–22 knots | €1,999 | |
| Naish | 2026 | 6 m² | — | 24–40 knots | €1,199 | |
| Naish | 2026 | 7 m² | — | 20–37 knots | €1,249 | |
| Naish | 2026 | 8 m² | — | 17–35 knots | €1,349 | |
| Naish | 2026 | 9 m² | — | 15–30 knots | €1,449 | |
| Naish | 2026 | 10 m² | — | 14–28 knots | €1,529 | |
| Naish | 2026 | 11 m² | — | 13–26 knots | €1,599 | |
| Naish | 2026 | 12 m² | — | 12–24 knots | €1,699 | |
| Naish | 2026 | 14 m² | — | 11–22 knots | €1,849 | |
| Naish | 2027 | 5 m² | — | 28–45 knots | €1,449 | |
| Naish | 2027 | 6 m² | — | 24–40 knots | €1,599 | |
| Naish | 2027 | 7 m² | — | 20–37 knots | €1,649 | |
| Naish | 2027 | 8 m² | — | 17–35 knots | €1,749 | |
| Naish | 2027 | 9 m² | — | 15–30 knots | €1,849 | |
| Naish | 2027 | 10 m² | — | 14–28 knots | €1,929 | |
| Naish | 2027 | 11 m² | — | 13–26 knots | €1,999 | |
| Naish | 2027 | 12 m² | — | 12–24 knots | €2,099 | |
| Naish | 2027 | 14 m² | — | 11–22 knots | €2,249 | |
| Naish | 2026 | 5 m² | — | 28–45 knots | €1,449 | |
| Naish | 2026 | 6 m² | — | 24–40 knots | €1,549 | |
| Naish | 2026 | 7 m² | — | 20–37 knots | €1,599 | |
| Naish | 2026 | 8 m² | — | 17–35 knots | €1,699 | |
| Naish | 2026 | 9 m² | — | 15–30 knots | €1,799 | |
| Naish | 2026 | 10 m² | — | 14–28 knots | €1,879 | |
| Naish | 2026 | 11 m² | — | 13–26 knots | €1,949 | |
| Naish | 2026 | 12 m² | — | 12–24 knots | €2,049 | |
| Naish | 2026 | 14 m² | — | 11–22 knots | €2,199 | |
| Naish | ≈ 2025 | 17 m² | — | 7–17 knots | ≈ €2,183 | |
| Naish | ≈ 2025 | 7 m² | — | 20–35 knots | ≈ €1,610 | |
| Naish | ≈ 2025 | 8 m² | — | 17–35 knots | ≈ €1,710 | |
| Naish | ≈ 2025 | 9 m² | — | 15–30 knots | €1,899 | |
| Naish | ≈ 2025 | 10 m² | — | 14–28 knots | ≈ €1,874 | |
| Naish | ≈ 2025 | 11 m² | — | 13–26 knots | ≈ €1,946 | |
| Naish | ≈ 2025 | 12 m² | — | 12–24 knots | ≈ €2,092 | |
| Naish | 2026 | 6 m² | — | 22–40 knots | €2,499 | |
| Naish | 2026 | 7 m² | — | 20–37 knots | €2,599 | |
| Naish | 2026 | 8 m² | — | 17–35 knots | €2,699 | |
| Naish | 2026 | 9 m² | — | 15–32 knots | €2,799 | |
| Naish | 2026 | 10 m² | — | 14–29 knots | €2,899 | |
| Naish | 2026 | 11 m² | — | 13–26 knots | €2,999 | |
| Naish | 2026 | 12 m² | — | 12–24 knots | €3,099 | |
| Naish | 2026 | 14 m² | — | 10–22 knots | €3,249 | |
| Naish | 2026 | 6 m² | — | 26–45 knots | €1,499 | |
| Naish | 2026 | 7 m² | — | 23–40 knots | €1,579 | |
| Naish | 2026 | 8 m² | — | 20–36 knots | €1,669 | |
| Naish | 2026 | 9 m² | — | 18–34 knots | €1,749 | |
| Naish | 2026 | 10 m² | — | 16–30 knots | €1,799 | |
| Naish | 2026 | 11 m² | — | 15–28 knots | €1,899 | |
| Naish | 2026 | 12 m² | — | 13–25 knots | €1,999 | |
| Naish | 2026 | 13.5 m² | — | 13–25 knots | €2,099 | |
| Naish | 2027 | 6 m² | — | 26–50 knots | €2,139 | |
| Naish | 2027 | 7 m² | — | 23–43 knots | €2,219 | |
| Naish | 2027 | 8 m² | — | 20–40 knots | €2,299 | |
| Naish | 2027 | 9 m² | — | 18–37 knots | €2,379 | |
| Naish | 2027 | 10 m² | — | 16–30 knots | €2,459 | |
| Naish | 2027 | 11 m² | — | 15–28 knots | €2,539 | |
| Naish | 2027 | 12 m² | — | 13–25 knots | €2,619 | |
| Naish | ≈ 2024 | 9 m² | — | 20–35 knots | ≈ €1,701 | |
| Naish | ≈ 2024 | 10 m² | — | 18–30 knots | ≈ €1,792 | |
| Naish | ≈ 2024 | 11 m² | — | 16–27 knots | ≈ €1,892 | |
| Naish | ≈ 2024 | 12 m² | — | 15–25 knots | ≈ €1,983 | |
| Naish | ≈ 2024 | 14 m² | — | 13–23 knots | ≈ €2,083 | |
| Naish | ≈ 2024 | 16 m² | — | 11–21 knots | ≈ €2,174 | |
| Naish | 2024 | 4 m² | — | 26+ knots | ≈ €227 | |
| North | 2025 | 5 m² | — | 22–36 knots | €1,415 | |
| North | 2025 | 6 m² | — | 20–34 knots | €1,485 | |
| North | 2025 | 7 m² | — | 18–32 knots | €1,555 | |
| North | 2025 | 8 m² | — | 16–30 knots | €1,639 | |
| North | 2025 | 9 m² | — | 14–28 knots | €1,719 | |
| North | 2025 | 10 m² | — | 12–26 knots | €1,799 | |
| North | 2025 | 12 m² | — | 9–20 knots | €1,949 | |
| North | 2025 | 3.5 m² | — | 22–40 knots | €1,199 | |
| North | 2025 | 4 m² | — | 20–32 knots | €1,289 | |
| North | 2025 | 5 m² | — | 18–28 knots | €1,359 | |
| North | 2025 | 6 m² | — | 17–27 knots | €1,409 | |
| North | 2025 | 7 m² | — | 16–26 knots | €1,489 | |
| North | 2025 | 8 m² | — | 14–23 knots | €1,569 | |
| North | 2025 | 9 m² | — | 12–20 knots | €1,639 | |
| North | 2025 | 10 m² | — | 11–19 knots | €1,689 | |
| North | 2025 | 11 m² | — | 10–18 knots | €1,769 | |
| North | 2025 | 14 m² | — | 7–17 knots | €1,839 | |
| North | 2027 | 6 m² | — | 20+ knots | €1,649 | |
| North | 2027 | 7 m² | — | 18–36+ knots | €1,729 | |
| North | 2027 | 8 m² | — | 16–35 knots | €1,799 | |
| North | 2027 | 9 m² | — | 14–32 knots | €1,879 | |
| North | 2027 | 10 m² | — | 12–29 knots | €1,949 | |
| North | 2027 | 11 m² | — | 11–27 knots | €2,039 | |
| North | 2027 | 12 m² | — | 10–25 knots | €2,119 | |
| North | 2027 | 14 m² | — | 8–22 knots | €2,199 | |
| North | 2026 | 6 m² | — | 20+ knots | €1,210 | |
| North | 2026 | 7 m² | — | 18–36+ knots | €1,210 | |
| North | 2026 | 8 m² | — | 16–35 knots | €1,259 | |
| North | 2026 | 9 m² | — | 14–32 knots | €1,315 | |
| North | 2026 | 10 m² | — | 12–29 knots | €1,364 | |
| North | 2026 | 11 m² | — | 11–27 knots | €1,427 | |
| North | 2026 | 12 m² | — | 10–25 knots | €1,483 | |
| North | 2026 | 14 m² | — | 8–22 knots | €1,539 | |
| North | 2027 | 5.9 m² | — | 20+ knots | €2,049 | |
| North | 2027 | 6.6 m² | — | 18–39 knots | €2,149 | |
| North | 2027 | 7.3 m² | — | 16–37 knots | €2,249 | |
| North | 2027 | 8.1 m² | — | 14–35 knots | €2,349 | |
| North | 2027 | 9 m² | — | 13–32 knots | €2,449 | |
| North | 2027 | 10 m² | — | 11–29 knots | €2,549 | |
| North | 2027 | 11 m² | — | 10–27 knots | €2,649 | |
| North | 2027 | 12 m² | — | 9–25 knots | €2,749 | |
| North | 2025 | 7 m² | — | 19–35 knots | €1,629 | |
| North | 2025 | 9 m² | — | 16–30 knots | €1,799 | |
| North | 2025 | 11 m² | — | 13–26 knots | €1,969 | |
| North | 2025 | 13 m² | — | 11–23 knots | €2,139 | |
| North | 2026 | 5 m² | — | 21–37 knots | €1,499 | |
| North | 2026 | 6 m² | — | 20–34 knots | €1,579 | |
| North | 2026 | 7 m² | — | 17–32 knots | €1,659 | |
| North | 2026 | 8 m² | — | 16–30 knots | €1,729 | |
| North | 2026 | 9 m² | — | 13–28 knots | €1,809 | |
| North | 2026 | 10 m² | — | 12–26 knots | €1,889 | |
| North | 2026 | 11 m² | — | 10–25 knots | €1,969 | |
| North | 2026 | 12 m² | — | 9–23 knots | €2,049 | |
| North | 2026 | 13 m² | — | 8–20 knots | €2,119 | |
| North | 2026 | 15 m² | — | 8–20 knots | €2,279 | |
| North | 2026 | 17 m² | — | 8–20 knots | €2,439 | |
| North | 2026 | 19 m² | — | 8–20 knots | €2,599 | |
| North | 2025 | 5 m² | — | 22–37 knots | €1,025 | |
| North | 2025 | 6 m² | — | 20–34 knots | €1,074 | |
| North | 2025 | 7 m² | — | 18–32 knots | €1,207 | |
| North | 2025 | 8 m² | — | 16–30 knots | €1,183 | |
| North | 2025 | 9 m² | — | 14–28 knots | €1,232 | |
| North | 2025 | 10 m² | — | 12–26 knots | €1,295 | |
| North | 2025 | 11 m² | — | 10–25 knots | €1,340 | |
| North | 2025 | 12 m² | — | 9–23 knots | €1,399 | |
| North | 2027 | 7 m² | — | 16–34 knots | €2,169 | |
| North | 2027 | 8 m² | — | 14–32 knots | €2,249 | |
| North | 2027 | 9 m² | — | 12–30 knots | €2,339 | |
| North | 2027 | 10 m² | — | 10–27 knots | €2,419 | |
| North | 2027 | 11 m² | — | 9–25 knots | €2,499 | |
| North | 2027 | 12 m² | — | 8–23 knots | €2,589 | |
| North | 2027 | 13 m² | — | 8–22 knots | €2,679 | |
| North | 2027 | 15 m² | — | 7–20 knots | €2,769 | |
| North | 2027 | 17 m² | — | 7–20 knots | €2,859 | |
| Ozone | Alpha V3 Ultra-X 4 | ≈ 2024 | 4 m² | 1.1 kg | 21–36 knots | €1,249* |
| Ozone | Alpha V3 Ultra-X 5 | ≈ 2024 | 5 m² | 1.3 kg | 19–34 knots | €1,329* |
| Ozone | Alpha V3 Ultra-X 6 | ≈ 2024 | 6 m² | 1.5 kg | 17–32 knots | €1,429* |
| Ozone | Alpha V3 Ultra-X 7 | ≈ 2024 | 7 m² | 1.6 kg | 15–30 knots | €1,489* |
| Ozone | Alpha V3 Ultra-X 8 | ≈ 2024 | 8 m² | 1.8 kg | 14–28 knots | €1,539* |
| Ozone | Alpha V3 Ultra-X 9 | ≈ 2024 | 9 m² | 1.9 kg | 13–26 knots | €1,589* |
| Ozone | Alpha V3 Ultra-X 10 | ≈ 2024 | 10 m² | 2 kg | 12–24 knots | €1,639* |
| Ozone | Alpha V3 Ultra-X 11 | ≈ 2024 | 11 m² | 2.2 kg | 11–23 knots | €1,709* |
| Ozone | Alpha V3 Ultra-X 12 | ≈ 2024 | 12 m² | 2.4 kg | 10–22 knots | €1,799* |
| Ozone | Alpha V3 Ultra-X 14 | ≈ 2024 | 14 m² | 2.7 kg | 9–20 knots | €1,909* |
| Ozone | Alpha V3 Ultra-X 16 | ≈ 2024 | 16 m² | 3 kg | 8–18 knots | €2,029* |
| Ozone | ≈ 2025 | 4 m² | 1.3 kg | 18–34 knots | €989* | |
| Ozone | ≈ 2025 | 6 m² | 1.7 kg | 16–31 knots | €1,119* | |
| Ozone | ≈ 2025 | 8 m² | 2 kg | 14–28 knots | €1,239* | |
| Ozone | ≈ 2025 | 10 m² | 2.3 kg | 12–25 knots | €1,349* | |
| Ozone | ≈ 2025 | 12 m² | 2.5 kg | 10–22 knots | €1,499* | |
| Ozone | ≈ 2025 | 14 m² | 2.8 kg | 9–20 knots | €1,619* | |
| Ozone | ≈ 2025 | 16 m² | 3 kg | 8–18 knots | €1,739* | |
| Ozone | Edge Race 6 | ≈ 2021 | 6 m² | 2.3 kg | 18–33 knots | — |
| Ozone | Edge Race 9 | ≈ 2021 | 9 m² | 3 kg | 15–27 knots | — |
| Ozone | Edge Race 13 | ≈ 2021 | 13 m² | 3.7 kg | 10–22 knots | — |
| Ozone | 2026 | 6 m² | 2.3 kg | 18–45 knots | €1,829* | |
| Ozone | 2026 | 7 m² | 2.5 kg | 17–42 knots | €1,919* | |
| Ozone | 2026 | 8 m² | 2.8 kg | 16–39 knots | €1,969* | |
| Ozone | 2026 | 9 m² | 3 kg | 15–36 knots | €2,039* | |
| Ozone | 2026 | 10 m² | 3.1 kg | 14–33 knots | €2,129* | |
| Ozone | 2026 | 11 m² | 3.3 kg | 13–30 knots | €2,169* | |
| Ozone | 2026 | 12 m² | 3.5 kg | 12–27 knots | €2,219* | |
| Ozone | 2026 | 13 m² | 3.7 kg | 10–24 knots | €2,279* | |
| Ozone | 2026 | 15 m² | 3.8 kg | 8–21 knots | €2,479* | |
| Ozone | 2026 | 18 m² | 4.3 kg | 6–19 knots | €2,699* | |
| Ozone | 2026 | 7 m² | 2.1 kg | 16–42 knots | €2,729* | |
| Ozone | 2026 | 8 m² | 2.3 kg | 15–39 knots | €2,829* | |
| Ozone | 2026 | 9 m² | 2.5 kg | 14–36 knots | €2,989* | |
| Ozone | 2026 | 10 m² | 2.7 kg | 13–33 knots | €3,079* | |
| Ozone | 2026 | 11 m² | 2.8 kg | 12–30 knots | €3,209* | |
| Ozone | 2026 | 12 m² | 2.9 kg | 11–27 knots | €3,349* | |
| Ozone | 2026 | 13 m² | 3 kg | 9–24 knots | €3,469* | |
| Ozone | 2026 | 15 m² | 3.3 kg | 7–21 knots | €3,569* | |
| Ozone | 2026 | 18 m² | 3.7 kg | 6–19 knots | €3,649* | |
| Ozone | ≈ 2024 | 5 m² | 1 kg | 14–33 knots | €2,280* | |
| Ozone | ≈ 2024 | 7 m² | 1.2 kg | 11–29 knots | €2,379* | |
| Ozone | ≈ 2024 | 9 m² | 1.4 kg | 9–26 knots | €2,488* | |
| Ozone | ≈ 2024 | 11 m² | 1.7 kg | 8–23 knots | €2,617* | |
| Ozone | ≈ 2024 | 13 m² | 1.9 kg | 7–20 knots | €2,697* | |
| Ozone | 2025 | 7 m² | 1.4 kg | 11–27 knots | €2,409* | |
| Ozone | 2025 | 9 m² | 1.6 kg | 9–26 knots | €2,529* | |
| Ozone | 2025 | 11 m² | 1.9 kg | 8–23 knots | €2,729* | |
| Ozone | 2025 | 13 m² | 2.2 kg | 7–20 knots | €2,819* | |
| Ozone | 2025 | 15 m² | 2.4 kg | 6–18 knots | €3,029* | |
| Ozone | 2025 | 18 m² | 2.8 kg | 5–15 knots | €3,149* | |
| Ozone | R1 V5 8 | ≈ 2024 | 8 m² | 1.7 kg | 13–38 knots | €2,999* |
| Ozone | R1 V5 9 | ≈ 2024 | 9 m² | 1.8 kg | 12–35 knots | €3,039* |
| Ozone | R1 V5 10 | ≈ 2024 | 10 m² | 2.2 kg | 10–30 knots | €3,649* |
| Ozone | R1 V5 11 | ≈ 2024 | 11 m² | 2.4 kg | 9–28 knots | €3,759* |
| Ozone | R1 V5 14 | ≈ 2024 | 14 m² | 2.8 kg | 8–25 knots | €4,009* |
| Ozone | R1 V5 15 | ≈ 2024 | 15 m² | 3 kg | 7–23 knots | €4,099* |
| Ozone | R1 V5 19 | ≈ 2024 | 19 m² | 3.1 kg | 6–20 knots | €4,309* |
| Ozone | R1 V5 21 | ≈ 2024 | 21 m² | 3.3 kg | 5–18 knots | €4,449* |
| Ozone | Reflex 5 | 2026 | 5 m² | 1.82 kg | 23–43 knots | €1,519* |
| Ozone | Reflex 6 | 2026 | 6 m² | 2.07 kg | 21–40 knots | €1,579* |
| Ozone | Reflex 7 | 2026 | 7 m² | 2.19 kg | 19–37 knots | €1,659* |
| Ozone | Reflex 8 | 2026 | 8 m² | 2.34 kg | 18–34 knots | €1,739* |
| Ozone | Reflex 9 | 2026 | 9 m² | 2.54 kg | 17–31 knots | €1,819* |
| Ozone | Reflex 10 | 2026 | 10 m² | 2.75 kg | 16–29 knots | €1,879* |
| Ozone | Reflex 11 | 2026 | 11 m² | 2.95 kg | 15–27 knots | €1,929* |
| Ozone | Reflex 12 | 2026 | 12 m² | 3.18 kg | 14–25 knots | €1,999* |
| Ozone | Reflex 13 | 2026 | 13 m² | 3.35 kg | 12–23 knots | €2,079* |
| Ozone | ≈ 2023 | 4 m² | 1.6 kg | 21–35 knots | €1,179* | |
| Ozone | ≈ 2023 | 5 m² | 1.7 kg | 20–33 knots | €1,239* | |
| Ozone | ≈ 2023 | 6 m² | 1.9 kg | 19–31 knots | €1,339* | |
| Ozone | ≈ 2023 | 7 m² | 2.1 kg | 18–30 knots | €1,409* | |
| Ozone | ≈ 2023 | 8 m² | 2.3 kg | 17–29 knots | €1,509* | |
| Ozone | ≈ 2023 | 9 m² | 2.5 kg | 16–28 knots | €1,569* | |
| Ozone | ≈ 2023 | 10 m² | 2.6 kg | 14–26 knots | €1,629* | |
| Ozone | ≈ 2023 | 11 m² | 2.8 kg | 13–25 knots | €1,729* | |
| Ozone | ≈ 2023 | 12 m² | 2.9 kg | 12–24 knots | €1,769* | |
| Ozone | ≈ 2023 | 4 m² | 1.4 kg | 21–35 knots | €1,339* | |
| Ozone | ≈ 2023 | 5 m² | 1.6 kg | 20–33 knots | €1,409* | |
| Ozone | ≈ 2023 | 6 m² | 1.8 kg | 19–31 knots | €1,519* | |
| Ozone | ≈ 2023 | 7 m² | 1.9 kg | 18–30 knots | €1,609* | |
| Ozone | ≈ 2023 | 8 m² | 2.1 kg | 17–29 knots | €1,719* | |
| Ozone | ≈ 2023 | 9 m² | 2.2 kg | 16–28 knots | €1,789* | |
| Ozone | ≈ 2023 | 10 m² | 2.3 kg | 14–26 knots | €1,859* | |
| Ozone | ≈ 2023 | 11 m² | 2.4 kg | 13–25 knots | €1,989* | |
| Ozone | ≈ 2023 | 12 m² | 2.5 kg | 12–24 knots | €2,039* | |
| Ozone | Vortex V2 Ultra-X 5 | 2026 | 5 m² | 1.6 kg | 23–46 knots | €2,469* |
| Ozone | Vortex V2 Ultra-X 6 | 2026 | 6 m² | 1.7 kg | 21–43 knots | €2,629* |
| Ozone | Vortex V2 Ultra-X 7 | 2026 | 7 m² | 1.9 kg | 19–40 knots | €2,739* |
| Ozone | Vortex V2 Ultra-X 8 | 2026 | 8 m² | 2.1 kg | 18–37 knots | €2,909* |
| Ozone | Vortex V2 Ultra-X 9 | 2026 | 9 m² | 2.3 kg | 17–34 knots | €3,039* |
| Ozone | Vortex V2 Ultra-X 10 | 2026 | 10 m² | 2.3 kg | 16–31 knots | €3,159* |
| Ozone | Vortex V2 Ultra-X 11 | 2026 | 11 m² | 2.5 kg | 15–29 knots | €3,279* |
| Ozone | Vortex V2 Ultra-X 12 | 2026 | 12 m² | 2.6 kg | 14–28 knots | €3,329* |
| Ozone | Vortex V2 Ultra-X 13 | 2026 | 13 m² | 2.7 kg | 12–26 knots | €3,439* |
| Ozone | Vortex V2 Ultra-X 15 | 2026 | 15 m² | 3 kg | 10–24 knots | €3,599* |
| Ozone | Vortex V2 Ultra-X 17 | 2026 | 17 m² | 3.4 kg | 8–21 knots | €3,899* |
| Ozone | ≈ 2023 | 17 m² | 3.5 kg | 6–20 knots | €2,549* | |
| Slingshot | ≈ 2025 | 14 m² | 3.5 kg | 10–27 knots | €1,649 | |
| Slingshot | ≈ 2026 | 7 m² | 2.38 kg | 25–42 knots | €2,599 | |
| Slingshot | ≈ 2026 | 8 m² | 2.53 kg | 23–40 knots | €2,699 | |
| Slingshot | ≈ 2026 | 9 m² | 2.72 kg | 20–38 knots | €2,799 | |
| Slingshot | ≈ 2026 | 10 m² | 2.88 kg | 15–36 knots | €2,899 | |
| Slingshot | ≈ 2026 | 12 m² | 3.2 kg | 13–31 knots | €3,099 | |
| Slingshot | ≈ 2026 | 14 m² | 3.5 kg | 10–27 knots | €3,299 | |
| Slingshot | ≈ 2027 | 5 m² | 2.13 kg | 25–40 knots | €1,349 | |
| Slingshot | ≈ 2027 | 6 m² | 2.3 kg | 23–35 knots | €1,429 | |
| Slingshot | ≈ 2027 | 7 m² | 2.49 kg | 22–33 knots | €1,499 | |
| Slingshot | ≈ 2027 | 8 m² | 2.7 kg | 21–30 knots | €1,579 | |
| Slingshot | ≈ 2027 | 9 m² | 2.89 kg | 19–28 knots | €1,649 | |
| Slingshot | ≈ 2027 | 10 m² | 3.06 kg | 17–26 knots | €1,729 | |
| Slingshot | ≈ 2027 | 11 m² | 3.27 kg | 15–24 knots | €1,799 | |
| Slingshot | ≈ 2027 | 12 m² | 3.44 kg | 13–20 knots | €1,879 | |
| Slingshot | ≈ 2027 | 14 m² | 3.81 kg | 11–18 knots | €2,039 | |
| Slingshot | ≈ 2027 | 17 m² | 4.28 kg | 9–16 knots | €2,199 | |
| Slingshot | ≈ 2026 | 6 m² | 2.43 kg | 21–36 knots | €1,429 | |
| Slingshot | ≈ 2026 | 7 m² | 2.56 kg | 19–34 knots | €1,499 | |
| Slingshot | ≈ 2026 | 8 m² | 2.62 kg | 17–32 knots | €1,579 | |
| Slingshot | ≈ 2026 | 9 m² | 2.82 kg | 15–30 knots | €1,649 | |
| Slingshot | ≈ 2026 | 10 m² | 3 kg | 13–28 knots | €1,729 | |
| Slingshot | ≈ 2026 | 12 m² | 3.35 kg | 11–22 knots | €1,879 | |
| Slingshot | ≈ 2023 | 2.5 m² | 1.2 kg | 25–42 knots | €379 | |
| Slingshot | ≈ 2024 | 9 m² | 2.28 kg | 13–31 knots | €715 | |
| Slingshot | ≈ 2024 | 10 m² | 2.39 kg | 10–27 knots | €765 | |
| Slingshot | ≈ 2024 | 12 m² | 2.75 kg | 6–22 knots | €815 | |
| Slingshot | ≈ 2026 | 3 m² | 1.21 kg | 25–42 knots | €1,039 | |
| Slingshot | ≈ 2026 | 4 m² | 1.42 kg | 23–40 knots | €1,109 | |
| Slingshot | ≈ 2026 | 6 m² | 1.81 kg | 20–38 knots | €1,219 | |
| Slingshot | ≈ 2026 | 8 m² | 2.15 kg | 15–36 knots | €1,359 | |
| Slingshot | ≈ 2026 | 9 m² | 2.36 kg | 13–31 knots | €1,425 | |
| Slingshot | ≈ 2026 | 10 m² | 2.46 kg | 10–27 knots | €1,519 | |
| Slingshot | ≈ 2026 | 12 m² | 2.8 kg | 6–24 knots | €1,619 | |
| Slingshot | ≈ 2026 | 15 m² | 3.25 kg | 5–20 knots | €1,899 | |
| Slingshot | ≈ 2026 | 17 m² | 3.61 kg | 4–18 knots | €1,999 | |
| Slingshot | ≈ 2026 | 6 m² | 2.56 kg | 21–40 knots | €1,479 | |
| Slingshot | ≈ 2026 | 7 m² | 2.78 kg | 19–38 knots | €1,549 | |
| Slingshot | ≈ 2026 | 8 m² | 3 kg | 17–36 knots | €1,629 | |
| Slingshot | ≈ 2026 | 9 m² | 3.23 kg | 15–34 knots | €1,699 | |
| Slingshot | ≈ 2026 | 10 m² | 3.42 kg | 13–32 knots | €1,779 | |
| Slingshot | ≈ 2026 | 12 m² | 3.84 kg | 11–26 knots | €1,929 | |
| Slingshot | ≈ 2024 | 6 m² | 2.22 kg | 22–34 knots | €779 | |
| Slingshot | ≈ 2024 | 7 m² | 2.4 kg | 18–33 knots | €819 | |
| Slingshot | ≈ 2024 | 8 m² | 2.6 kg | 16–31 knots | €869 | |
| Slingshot | ≈ 2024 | 9 m² | 2.8 kg | 14–29 knots | €915 | |
| Slingshot | ≈ 2024 | 12 m² | 3.36 kg | 10–22 knots | €1,049 | |
| Slingshot | ≈ 2023 | 4 m² | 1.58 kg | 29–40 knots | €579 | |
| Slingshot | ≈ 2023 | 9 m² | 2.58 kg | 17–29 knots | €739 | |
| Slingshot | ≈ 2023 | 10 m² | 2.78 kg | 14–25 knots | €795 | |
| Slingshot | ≈ 2027 | 3 m² | 1.07 kg | 16–42 knots | €989 | |
| Slingshot | ≈ 2027 | 4 m² | 1.23 kg | 14–40 knots | €1,059 | |
| Slingshot | ≈ 2027 | 5 m² | 1.39 kg | 12–38 knots | €1,149 | |
| Slingshot | ≈ 2027 | 6 m² | 1.56 kg | 10–34 knots | €1,199 | |
| Slingshot | ≈ 2027 | 7 m² | 1.71 kg | 9–30 knots | €1,249 | |
| Slingshot | ≈ 2027 | 8 m² | 1.86 kg | 8–25 knots | €1,299 | |
| Slingshot | ≈ 2027 | 9 m² | 2 kg | 7–20 knots | €1,349 | |
| Slingshot | ≈ 2027 | 10 m² | 2.19 kg | 6–19 knots | €1,399 | |
| Slingshot | ≈ 2027 | 11 m² | 2.2 kg | 5–18 knots | €1,449 | |
| Takoon | ≈ 2024 | 6 m² | 2.65 kg | 23–40 knots | €339 | |
| Takoon | ≈ 2024 | 7 m² | 2.75 kg | 20–38 knots | €356 | |
| Takoon | ≈ 2024 | 8 m² | 2.98 kg | 18–35 knots | €372 | |
| Takoon | ≈ 2024 | 9 m² | 3.2 kg | 15–32 knots | €380 | |
| Takoon | ≈ 2024 | 10 m² | 3.41 kg | 13–28 knots | €420 | |
| Takoon | ≈ 2024 | 12 m² | 3.86 kg | 11–25 knots | €460 | |
| Takoon | ≈ 2025 | 6 m² | 2.65 kg | 23–40 knots | €665 | |
| Takoon | ≈ 2025 | 7 m² | 2.75 kg | 20–38 knots | €699 | |
| Takoon | ≈ 2025 | 8 m² | 2.98 kg | 18–35 knots | €735 | |
| Takoon | ≈ 2025 | 9 m² | 3.2 kg | 15–32 knots | €769 | |
| Takoon | ≈ 2025 | 10 m² | 3.41 kg | 13–28 knots | €630 | |
| Takoon | ≈ 2025 | 12 m² | 3.86 kg | 11–25 knots | €690 | |
| Takoon | ≈ 2020 | 5 m² | — | 25–38 knots | €360 | |
| Takoon | ≈ 2020 | 6 m² | — | 22–36 knots | €370 | |
| Takoon | ≈ 2020 | 7 m² | — | 20–34 knots | €384 | |
| Takoon | ≈ 2020 | 8 m² | — | 18–31 knots | €408 | |
| Takoon | ≈ 2020 | 9 m² | — | 15–29 knots | €422 | |
| Takoon | ≈ 2020 | 10 m² | — | 13–27 knots | €450 | |
| Takoon | ≈ 2020 | 12 m² | — | 11–23 knots | €485 |
Method and sources
Show the chart for every wind strength
Sizes rated by the brands for each wind strength
| Wind | For 80 kg | Median size | Middle half of the sizes | Number of kites |
|---|---|---|---|---|
| 8 knots (15 km/h) | 13.9 m² | 14 m² | 12 to 15 m² | 127 |
| 10 knots (19 km/h) | 12.3 m² | 12 m² | 11 to 14 m² | 234 |
| 12 knots (22 km/h) | 11.7 m² | 12 m² | 10 to 13.5 m² | 354 |
| 15 knots (28 km/h) | 10.9 m² | 11 m² | 9 to 12 m² | 505 |
| 18 knots (33 km/h) | 9.6 m² | 10 m² | 8 to 12 m² | 624 |
| 20 knots (37 km/h) | 8.5 m² | 9 m² | 7 to 11 m² | 643 |
| 25 knots (46 km/h) | 7.5 m² | 8 m² | 6 to 10 m² | 553 |
| 30 knots (56 km/h) | 6.4 m² | 7 m² | 6 to 8 m² | 377 |
| 35 knots (65 km/h) | 6.4 m² | 6 m² | 5 to 7 m² | 205 |
A size counts for a wind when its published range includes it. The median size splits the rated sizes into two halves. The “For … kg” column scales the advice to your weight. Reference rider: 75 kg. How it is calculated →
Every brand publishes a wind range for each kite size. This chart gathers them: for each wind strength, the sizes the brands rate. Weight matters too: for the same size, brands rate a stronger wind for a heavier rider.
Which front wing size for kitefoil by rider weight? Size chart · Kitefoil kite size chart: which kite size for the wind and your weight? · Which kitefoil board volume for your weight? Volume chart · Which stabiliser size for kitefoil? Size chart · All Kitefoil guides
Prices and stock checked every other day; price with an asterisk: retailer price; “≈”: price converted from US dollars. Aspect ratio = span² / area.