Wingfoil
Quelle frontwing ?
Stock
| Takoon | 2024 | 400 cm² | — | — | — | — | — | 23 km/h | 179 € | |
| F-One | 2026 | 430 cm² | 58 cm | 7,8 | — | — | 10/10 * | 22 km/h | 1 049 € | |
| GONG | 2025 | 430 cm² | 65 cm | 9,8 | 92 mm | 10,9 mm | 10/10 | 22 km/h | 509 € | |
| Takoon | 2025 | 450 cm² | 66 cm | 9,7 | 103 mm | 12 mm | 10/10 | 22 km/h | 429 € | |
| Lift Foils | ≈ 2024 | 458 cm² | 97 cm | 20,5 | — | — | 7,4/10 * | 22 km/h | ≈ 1 074 € | |
| GONG | 2026 | 460 cm² | 60 cm | 7,8 | 112 mm | 12,5 mm | 10/10 | 22 km/h | 419 € | |
| Code Foils | ≈ 2026 | 475 cm² | 87 cm | 15,8 | — | — | 8/10 * | 21 km/h | 1 179 €* | |
| GONG | 2026 | 479 cm² | 60 cm | 7,5 | 111 mm | 11,9 mm | 10/10 | 21 km/h | 399 € | |
| Armstrong | 2024 | 480 cm² | 73 cm | 11 | — | — | 9/10 * | 21 km/h | 819 €* | |
| GONG | 2026 | 480 cm² | 71 cm | 10,5 | 101 mm | 12 mm | 10/10 | 21 km/h | 759 € | |
| GONG | 2025 | 480 cm² | 69 cm | 9,9 | 98 mm | 11,6 mm | 10/10 | 21 km/h | 529 € | |
| GONG | 2024 | 480 cm² | 60 cm | 7,5 | 111 mm | 11,9 mm | 10/10 | 21 km/h | 279 € | |
| Armstrong | 2025 | 490 cm² | 63 cm | 8,2 | — | — | 9,9/10 * | 21 km/h | 819 €* | |
| Axis | 2025 | 495 cm² | 89 cm | 16 | 92 mm | 10,7 mm | 8,9/10 | 21 km/h | ≈ 915 € | |
| Duotone | 2025 | 500 cm² | 61 cm | 7,4 | — | — | 10/10 * | 21 km/h | 749 € | |
| Duotone | 2027 | 500 cm² | 60 cm | 7,2 | — | — | 10/10 * | 21 km/h | 809 € | |
| F-One | 2026 | 500 cm² | 79 cm | 12,5 | — | — | 8,4/10 * | 21 km/h | 999 € | |
| GONG | 2025 | 500 cm² | 67 cm | 9 | 106 mm | 12,6 mm | 10/10 | 20 km/h | 299 € | |
| GONG | 2026 | 500 cm² | 67 cm | 9 | 106 mm | 12,6 mm | 10/10 | 20 km/h | 429 € | |
| North | 2024 | 500 cm² | 63 cm | 7,9 | — | — | 9,9/10 * | 21 km/h | 625 € | |
| GONG | 2024 | 510 cm² | 65 cm | 8,3 | 99 mm | 10,4 mm | 10/10 | 21 km/h | 279 € | |
| GONG | 2024 | 510 cm² | 65 cm | 8,3 | 99 mm | 10,4 mm | 10/10 | 21 km/h | 139 € | |
| GONG | 2026 | 510 cm² | 65 cm | 8,3 | 99 mm | 10,4 mm | 10/10 | 21 km/h | 199 € | |
| GONG | 2026 | 510 cm² | 66 cm | 8,5 | 103 mm | 11 mm | 10/10 | 21 km/h | 399 € | |
| Alpinefoil | ≈ 2025 | 515 cm² | 68 cm | 9 | — | — | 9,3/10 * | 20 km/h | 739 € | |
| Axis | 2024 | 518 cm² | 75 cm | 10,9 | 86 mm | — | 8,7/10 * | 20 km/h | ≈ 607 € | |
| GONG | 2026 | 520 cm² | 65 cm | 8,1 | 105 mm | 11,1 mm | 10/10 | 20 km/h | 409 € | |
| GONG | 2026 | 520 cm² | 65 cm | 8,1 | 106 mm | 11,4 mm | 10/10 | 20 km/h | 409 € | |
| GONG | 2025 | 520 cm² | 65 cm | 8,1 | 106 mm | 11,4 mm | 10/10 | 20 km/h | 285 € | |
| Axis | 2025 | 528 cm² | 92 cm | 16 | 95 mm | 11 mm | 8,5/10 | 20 km/h | ≈ 962 € | |
| Code Foils | ≈ 2026 | 530 cm² | 92 cm | 15,8 | — | — | 7,4/10 * | 20 km/h | 1 179 €* | |
| F-One | 2026 | 530 cm² | 58 cm | 6,3 | — | — | 10/10 * | 20 km/h | 1 149 € | |
| Takoon | 2025 | 530 cm² | 72 cm | 9,8 | 105 mm | 14 mm | 9,4/10 | 19 km/h | 439 € | |
| Indiana | ≈ 2026 | 533 cm² | 95 cm | 16,9 | 86 mm | 9 mm | 8,8/10 | 20 km/h | 899 € | |
| Indiana | 2025 | 535 cm² | 75 cm | 10,5 | 101 mm | 10,1 mm | 10/10 | 20 km/h | 499 €* | |
| Ensis | ≈ 2026 | 540 cm² | 64 cm | 7,5 | 110 mm | — | 9,7/10 * | 20 km/h | 899 € | |
| GONG | 2026 | 540 cm² | 75 cm | 10,4 | 106 mm | 12,8 mm | 9,3/10 | 19 km/h | 799 € | |
| GONG | 2025 | 540 cm² | 73 cm | 9,9 | 103 mm | 12,2 mm | 9,6/10 | 20 km/h | 559 € | |
| Indiana | 2024 | 540 cm² | 64 cm | 7,5 | 110 mm | 11,5 mm | 10/10 | 20 km/h | 709 €* | |
| Naish | 2026 | 544 cm² | 75 cm | 10,2 | — | — | 8,6/10 * | 20 km/h | ≈ 663 € | |
| Duotone | 2025 | 550 cm² | 68 cm | 8,4 | — | — | 9,2/10 * | 20 km/h | 879 € | |
| Duotone | 2026 | 550 cm² | 70 cm | 8,9 | — | — | 9/10 * | 20 km/h | 789 € | |
| F-One | 2026 | 550 cm² | 67 cm | 8,2 | — | — | 9,3/10 * | 20 km/h | 799 € | |
| Ketos | ≈ 2026 | 550 cm² | 74 cm | 10 | 104 mm | 12,5 mm | 9,4/10 | 19 km/h | 799 € | |
| KT Foiling | ≈ 2026 | 550 cm² | 67 cm | 8 | — | — | 9,3/10 * | 20 km/h | 565 €* | |
| Naish | 2024 | 550 cm² | 65 cm | 7,7 | — | — | 9,5/10 * | 20 km/h | ≈ 227 € | |
| Sabfoil | ≈ 2024 | 550 cm² | 68 cm | 8,4 | 100 mm | 14,1 mm | 9,6/10 | 18 km/h | 349 € | |
| Takoon | 2024 | 550 cm² | 66 cm | 7,9 | 110 mm | 13,6 mm | 9,9/10 | 19 km/h | 285 € | |
| Sabfoil | 2026 | 552 cm² | 70 cm | 8,9 | 105 mm | 13,1 mm | 9,6/10 | 19 km/h | 379 € | |
| Sabfoil | 2025 | 557 cm² | 70 cm | 8,8 | 105 mm | 13,2 mm | 9,6/10 | 19 km/h | 709 € | |
| GONG | 2026 | 560 cm² | 65 cm | 7,5 | 122 mm | 13,9 mm | 9,9/10 | 19 km/h | 429 € | |
| GONG | 2024 | 560 cm² | 63 cm | 7,1 | 124 mm | 13,3 mm | 10/10 | 20 km/h | 285 € | |
| Starboard | 2026 | 560 cm² | — | — | — | — | — | 20 km/h | 599 € | |
| GONG | 2026 | 561 cm² | 63 cm | 7,1 | 124 mm | 13,3 mm | 10/10 | 20 km/h | 409 € | |
| KT Foiling | ≈ 2026 | 565 cm² | 89 cm | 14,1 | — | — | 7,4/10 * | 19 km/h | 850 €* | |
| Alpinefoil | ≈ 2024 | 570 cm² | 86 cm | 13 | — | — | 7,6/10 * | 19 km/h | 799 € | |
| Armstrong | 2026 | 570 cm² | 85 cm | 12,6 | — | — | 7,7/10 * | 19 km/h | 1 019 €* | |
| KT Foiling | ≈ 2024 | 570 cm² | 78 cm | 10,5 | — | — | 8,2/10 * | 19 km/h | 599 €* | |
| Axis | 2025 | 578 cm² | 96 cm | 15,9 | 102 mm | 11,8 mm | 7,8/10 | 19 km/h | ≈ 1 010 € | |
| Armstrong | 2024 | 580 cm² | 78 cm | 10,5 | — | — | 8,2/10 * | 19 km/h | 819 €* | |
| Cabrinha | ≈ 2026 | 580 cm² | 76 cm | 10 | 107 mm | — | 8,3/10 * | 19 km/h | 589 € | |
| Lift Foils | ≈ 2024 | 580 cm² | 97 cm | 16,2 | — | — | 6,8/10 * | 19 km/h | ≈ 1 165 € | |
| Lift Foils | ≈ 2026 | 581 cm² | 81 cm | 11,3 | — | — | 7,9/10 * | 19 km/h | ≈ 819 € | |
| Axis | 2024 | 588 cm² | 80 cm | 10,9 | 91 mm | — | 8/10 * | 19 km/h | ≈ 624 € | |
| Axis | 2025 | 589 cm² | 74 cm | 9,3 | 112 mm | 13 mm | 9,1/10 | 19 km/h | ≈ 551 € | |
| Armstrong | 2025 | 590 cm² | 69 cm | 8,1 | — | — | 8,9/10 * | 19 km/h | 839 €* | |
| Code Foils | ≈ 2026 | 590 cm² | 97 cm | 15,8 | — | — | 6,8/10 * | 19 km/h | 1 199 €* | |
| GONG | 2026 | 590 cm² | 79 cm | 10,6 | 106 mm | 11,4 mm | 9,1/10 | 19 km/h | 439 € | |
| GONG | 2024 | 590 cm² | 77 cm | 10 | 98 mm | 10,3 mm | 9,5/10 | 19 km/h | 305 € | |
| GONG | 2026 | 590 cm² | 77 cm | 10 | 104 mm | 10,9 mm | 9,4/10 | 19 km/h | 239 € | |
| Lift Foils | Havoc 92↗ | ≈ 2024 | 594 cm² | 71 cm | 8,5 | — | — | 8,7/10 * | 19 km/h | ≈ 819 € |
| GoFoil | ≈ 2025 | 597 cm² | 74 cm | 9,1 | 106 mm | — | 8,5/10 * | 19 km/h | ≈ 682 € | |
| AFS | 2024 | 600 cm² | 81 cm | 11 | 100 mm | 10,8 mm | 9/10 | 19 km/h | 799 € | |
| AFS | ≈ 2024 | 600 cm² | 71 cm | 8,4 | 108 mm | 11,4 mm | 9,8/10 | 19 km/h | 1 259 € | |
| AFS | 2026 | 600 cm² | 98 cm | 16 | 84 mm | 10,8 mm | 7,8/10 | 18 km/h | 859 € | |
| Alpinefoil | 2024 | 600 cm² | 72 cm | 8,6 | — | — | 8,6/10 * | 19 km/h | 749 € | |
| Alpinefoil | 2025 | 600 cm² | 101 cm | 16,9 | 112 mm | — | 6,5/10 * | 19 km/h | 764 € | |
| Duotone | 2027 | 600 cm² | 86 cm | 12,3 | — | — | 7,5/10 * | 19 km/h | 799 € | |
| Eleveight | ≈ 2026 | 600 cm² | — | — | — | — | — | 19 km/h | 529 € | |
| F-One | 2026 | 600 cm² | 85 cm | 12 | — | — | 7,5/10 * | 19 km/h | 1 029 € | |
| GONG | 2026 | 600 cm² | 92 cm | 14,1 | 90 mm | 11,5 mm | 8,1/10 | 18 km/h | 489 € | |
| GONG | 2024 | 600 cm² | 89 cm | 13,2 | 89 mm | 10,8 mm | 8,4/10 | 18 km/h | 339 € | |
| GONG | 2025 | 600 cm² | 73 cm | 8,9 | 116 mm | 13,8 mm | 9/10 | 19 km/h | 305 € | |
| GONG | 2026 | 600 cm² | 73 cm | 8,9 | 116 mm | 13,8 mm | 9/10 | 19 km/h | 439 € | |
| GONG | 2024 | 600 cm² | 70 cm | 8,2 | 115 mm | 11 mm | 9,9/10 | 19 km/h | 255 € | |
| GONG | 2024 | 600 cm² | 70 cm | 8,2 | 115 mm | 11 mm | 9,9/10 | 19 km/h | 129 € | |
| GONG | 2024 | 600 cm² | 70 cm | 8,2 | 115 mm | 11 mm | 9,9/10 | 19 km/h | 255 € | |
| Ketos | 2026 | 600 cm² | 100 cm | 16,7 | 95 mm | 12,2 mm | 7,4/10 | 18 km/h | 990 € | |
| Naish | 2026 | 600 cm² | 71 cm | 8,5 | — | — | 8,7/10 * | 19 km/h | ≈ 618 € | |
| North | 2024 | 600 cm² | 68 cm | 7,7 | — | — | 9/10 * | 19 km/h | 635 € | |
| Slingshot | ≈ 2025 | 600 cm² | 81 cm | 11 | — | — | 7,8/10 * | 19 km/h | 849 € | |
| Takoon | ≈ 2026 | 600 cm² | 74 cm | 9 | 128 mm | 12,5 mm | 9,3/10 | 19 km/h | 386 € | |
| Takoon | 2025 | 600 cm² | 80 cm | 10,7 | 116 mm | 13 mm | 8,6/10 | 19 km/h | 378 € | |
| Axis | 2024 | 604 cm² | 88 cm | 12,8 | 93 mm | — | 7,3/10 * | 19 km/h | ≈ 865 € | |
| GONG | 2024 | 610 cm² | 72 cm | 8,5 | 110 mm | 11,5 mm | 9,6/10 | 19 km/h | 285 € | |
| GONG | 2024 | 610 cm² | 72 cm | 8,5 | 110 mm | 11,5 mm | 9,6/10 | 19 km/h | 145 € | |
| GONG | 2026 | 610 cm² | 71 cm | 8,3 | 110 mm | 11,5 mm | 9,7/10 | 19 km/h | 209 € | |
| GONG | 2026 | 610 cm² | 73 cm | 8,7 | 112 mm | 12,1 mm | 9,4/10 | 19 km/h | 409 € | |
| Duotone | 2025 | 620 cm² | 80 cm | 10,3 | — | — | 7,8/10 * | 19 km/h | 545 € | |
| F-One | 2026 | 620 cm² | 70 cm | 7,8 | — | — | 8,8/10 * | 19 km/h | 999 € | |
| GONG | 2024 | 620 cm² | 72 cm | 8,4 | 110 mm | 12,8 mm | 9,3/10 | 18 km/h | 279 € | |
| GONG | 2024 | 620 cm² | 72 cm | 8,4 | 110 mm | 12,8 mm | 9,3/10 | 18 km/h | 145 € | |
| GONG | 2026 | 620 cm² | 72 cm | 8,4 | 110 mm | 12,8 mm | 9,3/10 | 18 km/h | 209 € | |
| GONG | 2026 | 620 cm² | 72 cm | 8,4 | 112 mm | 12,5 mm | 9,3/10 | 18 km/h | 399 € | |
| GONG | 2026 | 620 cm² | 80 cm | 10,3 | 115 mm | 13,8 mm | 8,4/10 | 18 km/h | 829 € | |
| GONG | 2026 | 620 cm² | 71 cm | 8,1 | 115 mm | 12,2 mm | 9,5/10 | 19 km/h | 429 € | |
| GONG | 2026 | 620 cm² | 71 cm | 8,1 | 116 mm | 12,5 mm | 9,4/10 | 19 km/h | 429 € | |
| GONG | 2025 | 620 cm² | 71 cm | 8,1 | 116 mm | 12,4 mm | 9,4/10 | 19 km/h | 299 € | |
| GONG | 2024 | 620 cm² | 65 cm | 6,8 | 133 mm | 14,2 mm | 9,7/10 | 19 km/h | 299 € | |
| GONG | 2026 | 620 cm² | 65 cm | 6,8 | 133 mm | 14,2 mm | 9,7/10 | 19 km/h | 429 € | |
| Phantom | ≈ 2027 | 620 cm² | 76 cm | 9,4 | — | — | 8,2/10 * | 19 km/h | 549 € | |
| Slingshot | ≈ 2025 | 625 cm² | 72 cm | 8,4 | — | — | 8,5/10 * | 18 km/h | 779 € | |
| Axis | 2024 | 628 cm² | 62 cm | 6,1 | 127 mm | — | 9,5/10 * | 18 km/h | ≈ 535 € | |
| Ensis | ≈ 2026 | 630 cm² | 71 cm | 8,1 | 113 mm | — | 8,6/10 * | 18 km/h | 899 € | |
| F-One | 2026 | 630 cm² | 64 cm | 6,5 | — | — | 9,3/10 * | 18 km/h | 1 149 € | |
| Indiana | ≈ 2026 | 630 cm² | 77 cm | 9,5 | 113 mm | 10,5 mm | 9,3/10 | 19 km/h | 899 € | |
| Sabfoil | ≈ 2024 | 631 cm² | 78 cm | 9,6 | 100 mm | 15,3 mm | 8,2/10 | 17 km/h | 369 € | |
| Axis | 2024 | 634 cm² | 85 cm | 11,4 | 93 mm | — | 7,4/10 * | 18 km/h | ≈ 643 € | |
| Naish | 2024 | 640 cm² | 81 cm | 10,3 | — | — | 7,7/10 * | 18 km/h | ≈ 331 € | |
| Axis | 2025 | 642 cm² | 78 cm | 9,5 | 109 mm | 12,6 mm | 8,7/10 | 18 km/h | ≈ 586 € | |
| GoFoil | ≈ 2024 | 642 cm² | 69 cm | 7,4 | 120 mm | — | 8,7/10 * | 18 km/h | ≈ 614 € | |
| Naish | 2026 | 644 cm² | 81 cm | 10,2 | — | — | 7,7/10 * | 18 km/h | ≈ 691 € | |
| Unifoil | ≈ 2026 | 645 cm² | 82 cm | 10,5 | 109 mm | — | 7,6/10 * | 18 km/h | ≈ 618 € | |
| Sabfoil | 2026 | 648 cm² | 74 cm | 8,4 | 108 mm | 14,7 mm | 8,6/10 | 17 km/h | 739 € | |
| AFS | 2026 | 650 cm² | 77 cm | 9 | 113 mm | 13,6 mm | 8,6/10 | 18 km/h | 799 € | |
| Cabrinha | ≈ 2026 | 650 cm² | 67 cm | 6,9 | 140 mm | — | 8,9/10 * | 18 km/h | 619 € | |
| Core | ≈ 2026 | 650 cm² | 72 cm | 8 | — | — | 8,4/10 * | 18 km/h | 729 € | |
| Duotone | 2025 | 650 cm² | 68 cm | 7,1 | — | — | 8,8/10 * | 18 km/h | 799 € | |
| Duotone | 2027 | 650 cm² | 67 cm | 6,9 | — | — | 8,9/10 * | 18 km/h | 859 € | |
| F-One | 2026 | 650 cm² | 73 cm | 8,1 | — | — | 8,4/10 * | 18 km/h | 819 € | |
| Ketos | ≈ 2024 | 650 cm² | 75 cm | 8,7 | 120 mm | 11,5 mm | 9,2/10 | 19 km/h | 760 € | |
| KT Foiling | ≈ 2026 | 650 cm² | 96 cm | 14 | — | — | 6,6/10 * | 18 km/h | 975 €* | |
| Naish | 2024 | 650 cm² | 64 cm | 6,3 | — | — | 9,2/10 * | 18 km/h | ≈ 182 € | |
| Naish | 2024 | 650 cm² | 68 cm | 7,1 | — | — | 8,8/10 * | 18 km/h | ≈ 250 € | |
| Takoon | 2024 | 650 cm² | 72 cm | 8 | 120 mm | 14,9 mm | 8,7/10 | 18 km/h | 285 € | |
| Indiana | ≈ 2026 | 651 cm² | 105 cm | 16,9 | 95 mm | 10 mm | 7,4/10 | 18 km/h | 919 € | |
| Axis | 2025 | 653 cm² | 102 cm | 15,9 | 110 mm | 12,8 mm | 6,9/10 | 18 km/h | ≈ 1 062 € | |
| Code Foils | ≈ 2026 | 660 cm² | 102 cm | 15,8 | — | — | 6,2/10 * | 18 km/h | 1 259 €* | |
| GONG | 2026 | 660 cm² | 70 cm | 7,4 | 133 mm | 15,4 mm | 8,8/10 | 18 km/h | 445 € | |
| Sabfoil | 2025 | 661 cm² | 71 cm | 7,6 | 137 mm | 14,5 mm | 8,9/10 | 18 km/h | 399 € | |
| Armstrong | 2026 | 670 cm² | 92 cm | 12,6 | — | — | 6,8/10 * | 18 km/h | 1 069 €* | |
| GONG | 2025 | 670 cm² | 82 cm | 10 | 115 mm | 13,7 mm | 8,1/10 | 17 km/h | 579 € | |
| KT Foiling | ≈ 2026 | 670 cm² | 73 cm | 7,8 | — | — | 8,3/10 * | 18 km/h | 575 €* | |
| Axis | 2024 | 674 cm² | 82 cm | 10 | 100 mm | — | 7,5/10 * | 18 km/h | ≈ 598 € | |
| Duotone | 2026 | 675 cm² | 79 cm | 9,2 | — | — | 7,7/10 * | 18 km/h | 839 € | |
| Lift Foils | Havoc 105↗ | ≈ 2024 | 677 cm² | 70 cm | 7,2 | — | — | 8,5/10 * | 18 km/h | ≈ 842 € |
| Unifoil | ≈ 2026 | 677 cm² | 74 cm | 8,1 | 124 mm | — | 8,2/10 * | 18 km/h | ≈ 591 € | |
| Armstrong | 2024 | 680 cm² | 83 cm | 10,1 | — | — | 7,4/10 * | 18 km/h | 819 €* | |
| F-One | 2026 | 680 cm² | 73 cm | 7,7 | — | — | 8,3/10 * | 18 km/h | 1 029 € | |
| GONG | 2025 | 680 cm² | 73 cm | 7,8 | 132 mm | 15,9 mm | 8,4/10 | 17 km/h | 265 € | |
| GONG | 2024 | 680 cm² | 68 cm | 6,8 | 139 mm | 14,9 mm | 9/10 | 18 km/h | 299 € | |
| GONG | 2026 | 680 cm² | 68 cm | 6,8 | 139 mm | 14,9 mm | 9/10 | 18 km/h | 435 € | |
| KT Foiling | ≈ 2024 | 680 cm² | 85 cm | 10,6 | — | — | 7,3/10 * | 18 km/h | 620 €* | |
| Takoon | 2025 | 680 cm² | 82 cm | 9,8 | 118 mm | 15,6 mm | 7,7/10 | 17 km/h | 459 € | |
| Axis | 2024 | 686 cm² | 90 cm | 11,8 | 95 mm | — | 6,9/10 * | 18 km/h | ≈ 662 € | |
| Axis | 2024 | 689 cm² | 94 cm | 12,8 | 100 mm | — | 6,6/10 * | 18 km/h | ≈ 886 € | |
| Armstrong | 2025 | 690 cm² | 77 cm | 8,5 | — | — | 7,9/10 * | 18 km/h | 869 €* | |
| Ensis | ≈ 2026 | 690 cm² | 72 cm | 7,5 | 125 mm | — | 8,3/10 * | 18 km/h | 789 € | |
| F-One | 2026 | 690 cm² | 82 cm | 9,7 | — | — | 7,5/10 * | 18 km/h | 1 059 € | |
| GONG | 2024 | 690 cm² | 69 cm | 6,9 | 126 mm | 14,8 mm | 8,9/10 | 17 km/h | 139 € | |
| GONG | 2026 | 690 cm² | 69 cm | 6,9 | 126 mm | 14,8 mm | 8,9/10 | 17 km/h | 199 € | |
| Indiana | 2024 | 690 cm² | 72 cm | 7,5 | 125 mm | 13 mm | 9/10 | 18 km/h | 719 €* | |
| GoFoil | ≈ 2025 | 697 cm² | 88 cm | 11 | 106 mm | — | 7/10 * | 17 km/h | ≈ 700 € | |
| AFS | 2024 | 700 cm² | 88 cm | 11 | 108 mm | 12,9 mm | 7,7/10 | 17 km/h | 809 € | |
| AFS | 2024 | 700 cm² | 82 cm | 9,6 | 112 mm | 11,5 mm | 8,4/10 | 18 km/h | 1 279 € | |
| Alpinefoil | 2025 | 700 cm² | 89 cm | 11,3 | 112 mm | — | 6,9/10 * | 17 km/h | 729 € | |
| Cabrinha | ≈ 2026 | 700 cm² | 84 cm | 10 | 118 mm | — | 7,3/10 * | 17 km/h | 639 € | |
| Code Foils | ≈ 2025 | 700 cm² | 76 cm | 8,1 | — | — | 8/10 * | 17 km/h | 1 023 €* | |
| Core | ≈ 2026 | 700 cm² | 70 cm | 7 | — | — | 8,5/10 * | 17 km/h | 479 € | |
| Duotone | 2027 | 700 cm² | 92 cm | 12,1 | — | — | 6,7/10 * | 17 km/h | 849 € | |
| F-One | 2026 | 700 cm² | 92 cm | 12 | — | — | 6,7/10 * | 17 km/h | 1 059 € | |
| GONG | 2026 | 700 cm² | 70 cm | 7 | 142 mm | 16,3 mm | 8,5/10 | 17 km/h | 459 € | |
| GONG | 2025 | 700 cm² | 79 cm | 8,9 | 126 mm | 14,9 mm | 8/10 | 17 km/h | 309 € | |
| GONG | 2026 | 700 cm² | 79 cm | 8,9 | 126 mm | 14,9 mm | 8/10 | 17 km/h | 449 € | |
| GONG | 2024 | 700 cm² | 75 cm | 8 | 123 mm | 11 mm | 9,1/10 | 18 km/h | 345 € | |
| GONG | 2024 | 700 cm² | 75 cm | 8 | 123 mm | 11 mm | 9,1/10 | 18 km/h | 131 € | |
| GONG | 2024 | 700 cm² | 75 cm | 8 | 123 mm | 11 mm | 9,1/10 | 18 km/h | 259 € | |
| KT Foiling | ≈ 2024 | 700 cm² | 78 cm | 8,7 | — | — | 7,7/10 * | 17 km/h | 575 €* | |
| Naish | 2024 | 700 cm² | 73 cm | 7,6 | — | — | 8,2/10 * | 17 km/h | ≈ 250 € | |
| North | 2024 | 700 cm² | 72 cm | 7,4 | — | — | 8,3/10 * | 17 km/h | 655 € | |
| Omen | ≈ 2025 | 700 cm² | 84 cm | 10,2 | — | — | 7,2/10 * | 17 km/h | 625 € | |
| Sroka | ≈ 2026 | 700 cm² | 99 cm | 14 | 91 mm | — | 6,2/10 * | 17 km/h | 790 € | |
| Sroka | ≈ 2024 | 700 cm² | 90 cm | 11,6 | 103 mm | 14,2 mm | 7,3/10 | 16 km/h | 740 € | |
| Takoon | ≈ 2026 | 700 cm² | 80 cm | 9,1 | 132 mm | 13,5 mm | 8,2/10 | 18 km/h | 404 € | |
| Takoon | 2025 | 700 cm² | 87 cm | 10,7 | 126 mm | 14 mm | 7,6/10 | 17 km/h | 396 € | |
| Takoon | 2026 | 700 cm² | 110 cm | 17,3 | 103 mm | 14 mm | 6,1/10 | 17 km/h | 450 € | |
| GONG | 2024 | 710 cm² | 77 cm | 8,4 | 117 mm | 12,3 mm | 8,6/10 | 18 km/h | 289 € | |
| GONG | 2024 | 710 cm² | 77 cm | 8,4 | 117 mm | 12,3 mm | 8,6/10 | 18 km/h | 159 € | |
| GONG | 2026 | 710 cm² | 77 cm | 8,4 | 117 mm | 12,3 mm | 8,6/10 | 18 km/h | 229 € | |
| GONG | 2026 | 710 cm² | 78 cm | 8,6 | 121 mm | 13 mm | 8,4/10 | 17 km/h | 419 € | |
| Lift Foils | Florence X 110↗ | ≈ 2024 | 710 cm² | 97 cm | 13,3 | — | — | 6,3/10 * | 17 km/h | ≈ 864 € |
| Alpinefoil | ≈ 2024 | 715 cm² | 95 cm | 12,6 | — | — | 6,4/10 * | 17 km/h | 809 € | |
| Ensis | ≈ 2026 | 720 cm² | 83 cm | 9,5 | 121 mm | — | 7,3/10 * | 17 km/h | 899 € | |
| GONG | 2024 | 720 cm² | 78 cm | 8,5 | 119 mm | 13,8 mm | 8,2/10 | 17 km/h | 289 € | |
| GONG | 2024 | 720 cm² | 78 cm | 8,5 | 119 mm | 13,8 mm | 8,2/10 | 17 km/h | 159 € | |
| GONG | 2026 | 720 cm² | 78 cm | 8,5 | 119 mm | 13,8 mm | 8,2/10 | 17 km/h | 229 € | |
| GONG | 2026 | 720 cm² | 78 cm | 8,5 | 120 mm | 13,4 mm | 8,3/10 | 17 km/h | 419 € | |
| GONG | 2026 | 720 cm² | 77 cm | 8,2 | 124 mm | 13,1 mm | 8,4/10 | 17 km/h | 439 € | |
| GONG | 2026 | 720 cm² | 77 cm | 8,2 | 125 mm | 13,4 mm | 8,4/10 | 17 km/h | 439 € | |
| GONG | 2025 | 720 cm² | 77 cm | 8,2 | 125 mm | 13,4 mm | 8,4/10 | 17 km/h | 305 € | |
| Indiana | ≈ 2026 | 720 cm² | 83 cm | 9,5 | 121 mm | 11,1 mm | 8,4/10 | 18 km/h | 769 €* | |
| KT Foiling | 2025 | 720 cm² | 77 cm | 8,1 | — | — | 7,8/10 * | 17 km/h | 475 €* | |
| Axis | 2024 | 721 cm² | 67 cm | 6,2 | 135 mm | — | 8,7/10 * | 17 km/h | ≈ 551 € | |
| Slingshot | ≈ 2025 | 725 cm² | 80 cm | 8,8 | — | — | 7,5/10 * | 17 km/h | 799 € | |
| Axis | 2025 | 728 cm² | 83 cm | 9,5 | 116 mm | 13,5 mm | 7,8/10 | 17 km/h | ≈ 623 € | |
| Alpinefoil | 2025 | 730 cm² | 112 cm | 17,2 | 111 mm | — | 5,4/10 * | 17 km/h | 824 € | |
| Code Foils | ≈ 2025 | 740 cm² | 78 cm | 8,2 | — | — | 7,6/10 * | 17 km/h | 1 023 €* | |
| F-One | 2026 | 740 cm² | 76 cm | 7,7 | — | — | 7,8/10 * | 17 km/h | 1 049 € | |
| GONG | 2026 | 740 cm² | 88 cm | 10,5 | 119 mm | 12,8 mm | 7,6/10 | 17 km/h | 459 € | |
| GONG | 2024 | 740 cm² | 87 cm | 10,2 | 110 mm | 11,5 mm | 7,9/10 | 17 km/h | 319 € | |
| GONG | 2026 | 740 cm² | 87 cm | 10,2 | 117 mm | 12,3 mm | 7,7/10 | 17 km/h | 249 € | |
| GONG | 2024 | 740 cm² | 71 cm | 6,8 | 145 mm | 15,5 mm | 8,5/10 | 17 km/h | 309 € | |
| GONG | 2026 | 740 cm² | 71 cm | 6,8 | 145 mm | 15,5 mm | 8,5/10 | 17 km/h | 449 € | |
| Unifoil | ≈ 2026 | 740 cm² | 83 cm | 9,3 | 104 mm | — | 7,2/10 * | 17 km/h | ≈ 457 € | |
| Code Foils | ≈ 2026 | 741 cm² | 108 cm | 15,7 | — | — | 5,6/10 * | 17 km/h | 1 299 €* | |
| Unifoil | ≈ 2026 | 741 cm² | 76 cm | 7,8 | 129 mm | — | 7,8/10 * | 17 km/h | ≈ 636 € | |
| Naish | 2026 | 744 cm² | 87 cm | 10,2 | — | — | 6,9/10 * | 17 km/h | ≈ 709 € | |
| Axis | 2025 | 746 cm² | 109 cm | 15,9 | 118 mm | 13,6 mm | 6/10 | 17 km/h | ≈ 1 126 € | |
| Sabfoil | ≈ 2024 | 746 cm² | 82 cm | 9 | 112 mm | 16 mm | 7,4/10 | 16 km/h | 379 € | |
| GoFoil | ≈ 2025 | 747 cm² | 97 cm | 12,5 | 106 mm | — | 6,2/10 * | 17 km/h | ≈ 718 € | |
| AFS | ≈ 2025 | 750 cm² | 100 cm | 13,3 | 113 mm | 13,8 mm | 6,5/10 | 16 km/h | 739 € | |
| AFS | 2026 | 750 cm² | 82 cm | 9 | 123 mm | 14,7 mm | 7,6/10 | 16 km/h | 829 € | |
| AFS | 2024 | 750 cm² | 106 cm | 15 | 95 mm | 12,3 mm | 6,5/10 | 16 km/h | 929 € | |
| Cabrinha | 2026 | 750 cm² | 78 cm | 8,1 | 150 mm | — | 7,6/10 * | 17 km/h | 719 € | |
| Core | ≈ 2026 | 750 cm² | 79 cm | 8,2 | — | — | 7,6/10 * | 17 km/h | 749 € | |
| Duotone | 2025 | 750 cm² | 88 cm | 10,3 | — | — | 6,8/10 * | 17 km/h | 580 € | |
| Duotone | 2025 | 750 cm² | 88 cm | 10,3 | — | — | 6,8/10 * | 17 km/h | 349 € | |
| Eleveight | ≈ 2026 | 750 cm² | — | — | — | — | — | 17 km/h | 549 € | |
| F-One | 2026 | 750 cm² | 78 cm | 8 | — | — | 7,6/10 * | 17 km/h | 859 € | |
| GONG | 2026 | 750 cm² | 103 cm | 14,1 | 101 mm | 12,9 mm | 6,5/10 | 16 km/h | 519 € | |
| GONG | 2024 | 750 cm² | 100 cm | 13,3 | 100 mm | 12,2 mm | 6,9/10 | 16 km/h | 359 € | |
| GONG | 2026 | 750 cm² | 97 cm | 12,5 | 113 mm | 14,4 mm | 6,6/10 | 16 km/h | 479 € | |
| Ketos | ≈ 2024 | 750 cm² | 84 cm | 9,3 | 119 mm | 12,5 mm | 7,9/10 | 17 km/h | 710 € | |
| Phantom | ≈ 2027 | 750 cm² | 84 cm | 9,4 | — | — | 7,1/10 * | 17 km/h | 569 € | |
| Takoon | 2024 | 750 cm² | 78 cm | 8 | 129 mm | 16 mm | 7,8/10 | 16 km/h | 285 € | |
| Cabrinha | ≈ 2026 | 760 cm² | 97 cm | 12,4 | 108 mm | — | 6,2/10 * | 17 km/h | 879 € | |
| Armstrong | 2026 | 770 cm² | 99 cm | 12,6 | — | — | 6/10 * | 17 km/h | 1 119 €* | |
| Ketos | 2026 | 770 cm² | 105 cm | 14,3 | 120 mm | 14,8 mm | 6/10 | 16 km/h | 990 € | |
| Takoon | 2025 | 770 cm² | 86 cm | 9,7 | 126 mm | 16 mm | 7/10 | 16 km/h | 469 € | |
| Axis | 2024 | 773 cm² | 100 cm | 12,9 | 106 mm | — | 5,9/10 * | 17 km/h | ≈ 907 € | |
| Lift Foils | Havoc 121↗ | ≈ 2024 | 774 cm² | 74 cm | 7,1 | — | — | 7,9/10 * | 17 km/h | ≈ 864 € |
| Lift Foils | ≈ 2026 | 774 cm² | 89 cm | 10,2 | — | — | 6,7/10 * | 17 km/h | ≈ 864 € | |
| Lift Foils | ≈ 2026 | 774 cm² | 86 cm | 9,6 | — | — | 6,9/10 * | 17 km/h | ≈ 864 € | |
| KT Foiling | ≈ 2026 | 775 cm² | 104 cm | 14 | — | — | 5,7/10 * | 17 km/h | 1 120 €* | |
| Ketos | ≈ 2025 | 777 cm² | 99 cm | 12,6 | 120 mm | 15,3 mm | 6,2/10 | 16 km/h | 930 € | |
| Armstrong | 2024 | 780 cm² | 88 cm | 9,9 | — | — | 6,7/10 * | 16 km/h | 869 €* | |
| Sabfoil | 2025 | 784 cm² | 85 cm | 9,2 | 115 mm | 16 mm | 7,1/10 | 15 km/h | 749 € | |
| Armstrong | 2025 | 790 cm² | 82 cm | 8,4 | — | — | 7,2/10 * | 16 km/h | 899 €* | |
| Axis | 2024 | 790 cm² | 88 cm | 9,8 | 118 mm | — | 6,7/10 * | 16 km/h | ≈ 616 € | |
| F-One | 2026 | 790 cm² | 87 cm | 9,5 | — | — | 6,8/10 * | 16 km/h | 1 089 € | |
| KT Foiling | ≈ 2024 | 790 cm² | 92 cm | 10,7 | — | — | 6,4/10 * | 16 km/h | 630 €* | |
| Sabfoil | 2025 | 792 cm² | 81 cm | 8,2 | 143 mm | 15,3 mm | 7,5/10 | 16 km/h | 419 € | |
| Sabfoil | 2025 | 792 cm² | 81 cm | 8,2 | 143 mm | 15,3 mm | 7,5/10 | 16 km/h | 739 € | |
| AFS | 2024 | 800 cm² | 94 cm | 11 | 116 mm | 13,9 mm | 6,7/10 | 16 km/h | 829 € | |
| Duotone | 2025 | 800 cm² | 81 cm | 8,2 | — | — | 7,2/10 * | 16 km/h | 929 € | |
| Duotone | 2025 | 800 cm² | 75 cm | 7 | — | — | 7,7/10 * | 16 km/h | 849 € | |
| Duotone | 2025 | 800 cm² | 75 cm | 7 | — | — | 7,7/10 * | 16 km/h | 529 € | |
| Duotone | 2026 | 800 cm² | 85 cm | 9 | — | — | 6,9/10 * | 16 km/h | 889 € | |
| Duotone | 2027 | 800 cm² | 85 cm | 9 | — | — | 6,9/10 * | 16 km/h | 559 € | |
| Duotone | 2027 | 800 cm² | 74 cm | 6,8 | — | — | 7,8/10 * | 16 km/h | 909 € | |
| Eleveight | ≈ 2026 | 800 cm² | — | — | — | — | — | 16 km/h | 549 € | |
| F-One | 2026 | 800 cm² | 98 cm | 12 | — | — | 6/10 * | 16 km/h | 1 089 € | |
| GONG | 2024 | 800 cm² | 91 cm | 10,4 | 118 mm | 10 mm | 7,8/10 | 17 km/h | 359 € | |
| GONG | 2025 | 800 cm² | 84 cm | 8,8 | 134 mm | 16 mm | 7,1/10 | 16 km/h | 319 € | |
| GONG | 2026 | 800 cm² | 84 cm | 8,8 | 134 mm | 16 mm | 7,1/10 | 16 km/h | 459 € | |
| GONG | 2024 | 800 cm² | 80 cm | 8 | 131 mm | 12 mm | 8,2/10 | 17 km/h | 349 € | |
| GONG | 2024 | 800 cm² | 80 cm | 8 | 131 mm | 12 mm | 8,2/10 | 17 km/h | 132 € | |
| GONG | 2024 | 800 cm² | 80 cm | 8 | 131 mm | 12 mm | 8,2/10 | 17 km/h | 349 € | |
| KT Foiling | ≈ 2026 | 800 cm² | 80 cm | 8 | — | — | 7,3/10 * | 16 km/h | 595 €* | |
| Naish | 2026 | 800 cm² | 82 cm | 8,4 | — | — | 7,1/10 * | 16 km/h | ≈ 654 € | |
| Slingshot | ≈ 2025 | 800 cm² | 94 cm | 11 | — | — | 6,3/10 * | 16 km/h | 869 € | |
| Sroka | ≈ 2024 | 800 cm² | 94 cm | 11 | 110 mm | 14,3 mm | 6,7/10 | 16 km/h | 740 € | |
| Takoon | ≈ 2026 | 800 cm² | 85 cm | 9 | 140 mm | 14,5 mm | 7,3/10 | 17 km/h | 422 € | |
| Takoon | 2025 | 800 cm² | 92 cm | 10,6 | 135 mm | 15 mm | 6,7/10 | 16 km/h | 414 € | |
| Unifoil | ≈ 2026 | 806 cm² | 90 cm | 10 | 116 mm | — | 6,5/10 * | 16 km/h | ≈ 636 € | |
| Code Foils | ≈ 2025 | 810 cm² | 81 cm | 8,2 | — | — | 7,2/10 * | 16 km/h | 1 050 €* | |
| GONG | 2024 | 810 cm² | 82 cm | 8,3 | 125 mm | 13,1 mm | 7,8/10 | 16 km/h | 299 € | |
| GONG | 2024 | 810 cm² | 82 cm | 8,3 | 125 mm | 13,1 mm | 7,8/10 | 16 km/h | 165 € | |
| GONG | 2026 | 810 cm² | 82 cm | 8,3 | 125 mm | 13,1 mm | 7,8/10 | 16 km/h | 239 € | |
| GONG | 2026 | 810 cm² | 84 cm | 8,7 | 129 mm | 13,9 mm | 7,4/10 | 16 km/h | 429 € | |
| Naish | 2024 | 810 cm² | 64 cm | 5,1 | — | — | 8,8/10 * | 16 km/h | ≈ 209 € | |
| Alpinefoil | 2025 | 820 cm² | 96 cm | 11,2 | 120 mm | — | 6,1/10 * | 16 km/h | 739 € | |
| F-One | 2026 | 820 cm² | 80 cm | 7,7 | — | — | 7,3/10 * | 16 km/h | 1 099 € | |
| GONG | 2024 | 820 cm² | 83 cm | 8,4 | 127 mm | 14,7 mm | 7,3/10 | 16 km/h | 299 € | |
| GONG | 2024 | 820 cm² | 83 cm | 8,4 | 127 mm | 14,7 mm | 7,3/10 | 16 km/h | 165 € | |
| GONG | 2026 | 820 cm² | 83 cm | 8,4 | 127 mm | 14,7 mm | 7,3/10 | 16 km/h | 239 € | |
| GONG | 2026 | 820 cm² | 83 cm | 8,4 | 129 mm | 14,3 mm | 7,4/10 | 16 km/h | 429 € | |
| GONG | 2026 | 820 cm² | 82 cm | 8,2 | 132 mm | 14 mm | 7,6/10 | 16 km/h | 449 € | |
| GONG | 2026 | 820 cm² | 82 cm | 8,2 | 134 mm | 14,3 mm | 7,5/10 | 16 km/h | 449 € | |
| GONG | 2025 | 820 cm² | 82 cm | 8,2 | 134 mm | 14,3 mm | 7,5/10 | 16 km/h | 309 € | |
| Takoon | 2024 | 820 cm² | 79 cm | 7,5 | 134 mm | 17 mm | 7,3/10 | 15 km/h | 220 € | |
| Duotone | 2027 | 825 cm² | 100 cm | 12,1 | — | — | 5,8/10 * | 16 km/h | 899 € | |
| Duotone | 2027 | 825 cm² | 100 cm | 12,1 | — | — | 5,8/10 * | 16 km/h | 569 € | |
| Slingshot | ≈ 2025 | 825 cm² | 85 cm | 8,8 | — | — | 6,8/10 * | 16 km/h | 849 € | |
| Cabrinha | ≈ 2026 | 830 cm² | 91 cm | 10 | 130 mm | — | 6,4/10 * | 16 km/h | 689 € | |
| KT Foiling | ≈ 2024 | 830 cm² | 86 cm | 8,9 | — | — | 6,7/10 * | 16 km/h | 595 €* | |
| Axis | 2025 | 835 cm² | 89 cm | 9,5 | 125 mm | 14,5 mm | 6,9/10 | 16 km/h | ≈ 662 € | |
| GoFoil | ≈ 2025 | 837 cm² | 97 cm | 11,1 | 111 mm | — | 6/10 * | 16 km/h | ≈ 736 € | |
| Unifoil | ≈ 2026 | 838 cm² | 83 cm | 8,1 | 136 mm | — | 7/10 * | 16 km/h | ≈ 682 € | |
| Lift Foils | ≈ 2024 | 839 cm² | 99 cm | 11,7 | — | — | 5,8/10 * | 16 km/h | ≈ 887 € | |
| Ensis | ≈ 2026 | 840 cm² | 80 cm | 7,5 | 135 mm | — | 7,2/10 * | 16 km/h | 799 € | |
| Indiana | 2024 | 840 cm² | 80 cm | 7,5 | 135 mm | 14 mm | 7,7/10 | 16 km/h | 739 €* | |
| Naish | 2024 | 840 cm² | 90 cm | 9,6 | — | — | 6,4/10 * | 16 km/h | ≈ 350 € | |
| Sabfoil | ≈ 2024 | 843 cm² | 88 cm | 9,2 | 118 mm | 16,8 mm | 6,5/10 | 15 km/h | 389 € | |
| Naish | 2026 | 844 cm² | 93 cm | 10,2 | — | — | 6,2/10 * | 16 km/h | ≈ 736 € | |
| AFS | 2026 | 850 cm² | 88 cm | 9 | 132 mm | 15,7 mm | 6,7/10 | 15 km/h | 849 € | |
| Cabrinha | 2026 | 850 cm² | 83 cm | 8,1 | 160 mm | — | 6,9/10 * | 16 km/h | 749 € | |
| Core | ≈ 2026 | 850 cm² | 87 cm | 8,8 | — | — | 6,6/10 * | 16 km/h | 769 € | |
| Core | ≈ 2026 | 850 cm² | 76 cm | 6,8 | — | — | 7,5/10 * | 16 km/h | 579 € | |
| Core | ≈ 2026 | 850 cm² | 90 cm | 9,5 | — | — | 6,4/10 * | 16 km/h | 479 € | |
| Duotone | 2025 | 850 cm² | 86 cm | 8,7 | — | — | 6,7/10 * | 16 km/h | 300 € | |
| F-One | 2026 | 850 cm² | 83 cm | 8 | — | — | 7/10 * | 16 km/h | 899 € | |
| GONG | 2024 | 850 cm² | 74 cm | 6,4 | 147 mm | 17,3 mm | 7,6/10 | 16 km/h | 139 € | |
| GONG | 2026 | 850 cm² | 74 cm | 6,4 | 147 mm | 17,3 mm | 7,6/10 | 16 km/h | 199 € | |
| Indiana | 2025 | 850 cm² | 95 cm | 10,6 | 127 mm | 12,7 mm | 6,8/10 | 16 km/h | 519 €* | |
| Ketos | ≈ 2024 | 850 cm² | 85 cm | 8,5 | 135 mm | 13,7 mm | 7,3/10 | 16 km/h | 760 € | |
| Naish | 2027 | 850 cm² | — | — | — | — | — | 16 km/h | ≈ 327 € | |
| Naish | 2024 | 850 cm² | 73 cm | 6,2 | — | — | 7,8/10 * | 16 km/h | ≈ 362 € | |
| North | 2024 | 850 cm² | 78 cm | 7,2 | — | — | 7,3/10 * | 16 km/h | 676 € | |
| Takoon | 2024 | 850 cm² | 84 cm | 8,3 | 134 mm | 16,6 mm | 6,9/10 | 15 km/h | 300 € | |
| Code Foils | ≈ 2026 | 855 cm² | 116 cm | 15,8 | — | — | 4,8/10 * | 16 km/h | 1 389 €* | |
| Alpinefoil | ≈ 2024 | 860 cm² | 106 cm | 13,1 | — | — | 5,3/10 * | 16 km/h | 829 € | |
| GONG | 2026 | 865 cm² | 78 cm | 7 | 141 mm | 16,6 mm | 7,3/10 | 15 km/h | 219 € | |
| Armstrong | 2026 | 870 cm² | 105 cm | 12,6 | — | — | 5,4/10 * | 16 km/h | 1 169 €* | |
| GONG | 2024 | 870 cm² | 78 cm | 7 | 141 mm | 16,6 mm | 7,3/10 | 15 km/h | 149 € | |
| Unifoil | ≈ 2026 | 871 cm² | 90 cm | 9,4 | 111 mm | — | 6,3/10 * | 16 km/h | ≈ 477 € | |
| Axis | 2024 | 877 cm² | 107 cm | 13,1 | 112 mm | — | 5,2/10 * | 16 km/h | ≈ 924 € | |
| AFS | 2024 | 880 cm² | 90 cm | 9,2 | 137 mm | 14,1 mm | 6,8/10 | 16 km/h | 1 299 € | |
| Armstrong | 2024 | 880 cm² | 92 cm | 9,7 | — | — | 6,1/10 * | 16 km/h | 899 €* | |
| Starboard | 2026 | 880 cm² | — | — | — | — | — | 16 km/h | 749 € | |
| Armstrong | 2025 | 890 cm² | 86 cm | 8,3 | — | — | 6,6/10 * | 15 km/h | 929 €* | |
| Code Foils | ≈ 2025 | 890 cm² | 85 cm | 8,2 | — | — | 6,6/10 * | 15 km/h | 1 123 €* | |
| F-One | 2026 | 890 cm² | 93 cm | 9,6 | — | — | 6,1/10 * | 15 km/h | 1 139 € | |
| GONG | 2026 | 890 cm² | 97 cm | 10,6 | 130 mm | 14 mm | 6,3/10 | 15 km/h | 479 € | |
| GONG | 2024 | 890 cm² | 95 cm | 10,1 | 120 mm | 12,6 mm | 6,7/10 | 16 km/h | 335 € | |
| GONG | 2026 | 890 cm² | 95 cm | 10,1 | 128 mm | 13,4 mm | 6,5/10 | 16 km/h | 269 € | |
| Phantom | ≈ 2027 | 890 cm² | 91 cm | 9,2 | — | — | 6,3/10 * | 15 km/h | 579 € | |
| AFS | 2024 | 900 cm² | 99 cm | 11 | 122 mm | 14,6 mm | 6/10 | 15 km/h | 839 € | |
| AFS | 2026 | 900 cm² | 112 cm | 13,9 | 106 mm | 13,9 mm | 5,4/10 | 15 km/h | 1 069 € | |
| Axis | 2024 | 900 cm² | 94 cm | 9,8 | 126 mm | — | 6/10 * | 15 km/h | ≈ 634 € | |
| Duotone | 2025 | 900 cm² | 96 cm | 10,2 | — | — | 5,8/10 * | 15 km/h | 615 € | |
| Duotone | 2025 | 900 cm² | 96 cm | 10,2 | — | — | 5,8/10 * | 15 km/h | 384 € | |
| Eleveight | ≈ 2026 | 900 cm² | — | — | — | — | — | 15 km/h | 569 € | |
| Eleveight | ≈ 2026 | 900 cm² | — | — | — | — | — | 15 km/h | 1 399 € | |
| Ensis | ≈ 2026 | 900 cm² | 93 cm | 9,5 | 135 mm | — | 6,1/10 * | 15 km/h | 959 € | |
| F-One | 2026 | 900 cm² | 104 cm | 12 | — | — | 5,3/10 * | 15 km/h | 1 139 € | |
| GONG | 2026 | 900 cm² | 113 cm | 14,2 | 111 mm | 14,1 mm | 5,3/10 | 15 km/h | 549 € | |
| GONG | 2024 | 900 cm² | 109 cm | 13,2 | 109 mm | 13,2 mm | 5,7/10 | 15 km/h | 379 € | |
| GONG | 2026 | 900 cm² | 107 cm | 12,7 | 124 mm | 15,8 mm | 5,3/10 | 15 km/h | 499 € | |
| GONG | 2025 | 900 cm² | 89 cm | 8,8 | 143 mm | 16,9 mm | 6,3/10 | 15 km/h | 335 € | |
| GONG | 2026 | 900 cm² | 89 cm | 8,8 | 143 mm | 16,9 mm | 6,3/10 | 15 km/h | 479 € | |
| GONG | 2024 | 900 cm² | 85 cm | 8 | 140 mm | 13 mm | 7,3/10 | 16 km/h | 355 € | |
| GONG | 2024 | 900 cm² | 85 cm | 8 | 140 mm | 13 mm | 7,3/10 | 16 km/h | 134 € | |
| GONG | 2024 | 900 cm² | 85 cm | 8 | 140 mm | 13 mm | 7,3/10 | 16 km/h | 355 € | |
| Indiana | ≈ 2026 | 900 cm² | 93 cm | 9,5 | 135 mm | 12,5 mm | 6,9/10 | 16 km/h | 799 €* | |
| Naish | 2024 | 900 cm² | 80 cm | 7,1 | — | — | 7/10 * | 15 km/h | ≈ 342 € | |
| North | ≈ 2024 | 900 cm² | 108 cm | 13 | — | — | 5,1/10 * | 15 km/h | 819 € | |
| Omen | ≈ 2025 | 900 cm² | 95 cm | 10,1 | — | — | 5,9/10 * | 15 km/h | 655 € | |
| Sroka | ≈ 2026 | 900 cm² | 112 cm | 13,9 | 104 mm | — | 4,9/10 * | 15 km/h | 790 € | |
| Takoon | ≈ 2026 | 900 cm² | 90 cm | 9 | 144 mm | 15,5 mm | 6,5/10 | 15 km/h | 440 € | |
| Takoon | 2025 | 900 cm² | 98 cm | 10,7 | 145 mm | 16 mm | 5,8/10 | 15 km/h | 432 € | |
| Takoon | 2024 | 900 cm² | — | — | — | — | — | 15 km/h | 419 € | |
| Takoon | 2026 | 900 cm² | — | — | — | — | — | 15 km/h | 432 € | |
| Unifoil | ≈ 2026 | 903 cm² | 90 cm | 8,9 | 111 mm | — | 6,3/10 * | 15 km/h | ≈ 650 € | |
| Cabrinha | ≈ 2026 | 905 cm² | 100 cm | 11 | 120 mm | — | 5,6/10 * | 15 km/h | 899 € | |
| GONG | 2024 | 910 cm² | 87 cm | 8,3 | 132 mm | 13,9 mm | 7/10 | 15 km/h | 305 € | |
| GONG | 2024 | 910 cm² | 87 cm | 8,3 | 132 mm | 13,9 mm | 7/10 | 15 km/h | 169 € | |
| GONG | 2026 | 910 cm² | 87 cm | 8,3 | 132 mm | 13,9 mm | 7/10 | 15 km/h | 249 € | |
| GONG | 2026 | 910 cm² | 89 cm | 8,7 | 137 mm | 14,7 mm | 6,7/10 | 15 km/h | 439 € | |
| Naish | 2024 | 914 cm² | 88 cm | 8,4 | — | — | 6,4/10 * | 15 km/h | ≈ 237 € | |
| F-One | 2026 | 920 cm² | 84 cm | 7,7 | — | — | 6,7/10 * | 15 km/h | 1 149 € | |
| GONG | 2024 | 920 cm² | 88 cm | 8,4 | 134 mm | 15,6 mm | 6,5/10 | 15 km/h | 305 € | |
| GONG | 2024 | 920 cm² | 88 cm | 8,4 | 134 mm | 15,6 mm | 6,5/10 | 15 km/h | 169 € | |
| GONG | 2026 | 920 cm² | 88 cm | 8,4 | 134 mm | 15,6 mm | 6,5/10 | 15 km/h | 249 € | |
| GONG | 2026 | 920 cm² | 88 cm | 8,4 | 136 mm | 15,2 mm | 6,6/10 | 15 km/h | 439 € | |
| GONG | 2026 | 920 cm² | 87 cm | 8,2 | 141 mm | 15,2 mm | 6,7/10 | 15 km/h | 469 € | |
| GONG | 2025 | 920 cm² | 87 cm | 8,2 | 141 mm | 15,1 mm | 6,7/10 | 15 km/h | 325 € | |
| KT Foiling | 2025 | 920 cm² | 88 cm | 8,4 | — | — | 6,4/10 * | 15 km/h | 475 €* | |
| Duotone | 2026 | 925 cm² | 90 cm | 8,8 | — | — | 6,2/10 * | 15 km/h | 939 € | |
| Duotone | 2027 | 925 cm² | 90 cm | 8,8 | — | — | 6,2/10 * | 15 km/h | 609 € | |
| Slingshot | ≈ 2025 | 925 cm² | 90 cm | 8,7 | — | — | 6,2/10 * | 15 km/h | 849 € | |
| KT Foiling | ≈ 2026 | 930 cm² | 114 cm | 14 | — | — | 4,7/10 * | 15 km/h | 1 250 €* | |
| Sroka | ≈ 2024 | 930 cm² | 101 cm | 11 | 118 mm | 14,9 mm | 5,8/10 | 15 km/h | 760 € | |
| Alpinefoil | 2025 | 935 cm² | 127 cm | 17,1 | 125 mm | — | 4/10 * | 15 km/h | 849 € | |
| Takoon | 2024 | 940 cm² | 85 cm | 7,7 | 145 mm | 18,7 mm | 6,2/10 | 14 km/h | 239 € | |
| Sabfoil | ≈ 2024 | 942 cm² | 98 cm | 10,2 | 119 mm | 16,8 mm | 5,6/10 | 14 km/h | 399 € | |
| Naish | 2026 | 944 cm² | 98 cm | 10,2 | — | — | 5,6/10 * | 15 km/h | ≈ 754 € | |
| Axis | 2025 | 949 cm² | 95 cm | 9,5 | 134 mm | 15,5 mm | 6/10 | 15 km/h | ≈ 704 € | |
| AFS | 2024 | 950 cm² | 88 cm | 8,2 | 150 mm | 13,5 mm | 6,9/10 | 16 km/h | 499 € | |
| AFS | 2026 | 950 cm² | 93 cm | 9 | 140 mm | 16,7 mm | 6/10 | 15 km/h | 869 € | |
| Core | ≈ 2026 | 950 cm² | 92 cm | 8,8 | — | — | 6/10 * | 15 km/h | 789 € | |
| Duotone | 2025 | 950 cm² | 81 cm | 6,9 | — | — | 6,8/10 * | 15 km/h | 899 € | |
| Duotone | 2025 | 950 cm² | 81 cm | 6,9 | — | — | 6,8/10 * | 15 km/h | 579 € | |
| Duotone | 2027 | 950 cm² | 105 cm | 11,6 | — | — | 5,2/10 * | 15 km/h | 949 € | |
| Duotone | 2027 | 950 cm² | 105 cm | 11,6 | — | — | 5,2/10 * | 15 km/h | 619 € | |
| Ensis | ≈ 2026 | 950 cm² | 75 cm | 6 | 160 mm | — | 7,3/10 * | 15 km/h | 506 € | |
| F-One | 2026 | 950 cm² | 87 cm | 8 | — | — | 6,4/10 * | 15 km/h | 949 € | |
| Ketos | ≈ 2024 | 950 cm² | 94 cm | 9,3 | 144 mm | 13,5 mm | 6,5/10 | 16 km/h | 725 € | |
| KT Foiling | ≈ 2026 | 950 cm² | 87 cm | 8 | — | — | 6,4/10 * | 15 km/h | 620 €* | |
| North | 2024 | 950 cm² | 82 cm | 7,1 | — | — | 6,8/10 * | 15 km/h | 686 € | |
| Sabfoil | 2025 | 950 cm² | 78 cm | 6,4 | 186 mm | 18,2 mm | 6,9/10 | 15 km/h | 719 € | |
| Takoon | 2024 | 950 cm² | 89 cm | 8,3 | 141 mm | 16,7 mm | 6,2/10 | 15 km/h | 322 € | |
| Sabfoil | 2025 | 953 cm² | 98 cm | 10 | 119 mm | 16,7 mm | 5,6/10 | 14 km/h | 759 € | |
| Lift Foils | Havoc 148↗ | ≈ 2024 | 955 cm² | 83 cm | 7,2 | — | — | 6,7/10 * | 15 km/h | ≈ 887 € |
| GoFoil | ≈ 2025 | 957 cm² | 99 cm | 10,2 | 111 mm | — | 5,5/10 * | 15 km/h | ≈ 754 € | |
| Alpinefoil | 2025 | 960 cm² | 103 cm | 11,1 | 130 mm | — | 5,3/10 * | 15 km/h | 759 € | |
| Cabrinha | ≈ 2026 | 960 cm² | 98 cm | 10 | 140 mm | — | 5,6/10 * | 15 km/h | 739 € | |
| Ketos | ≈ 2025 | 960 cm² | 111 cm | 12,8 | 135 mm | 16,5 mm | 4,8/10 | 14 km/h | 930 € | |
| KT Foiling | ≈ 2024 | 960 cm² | 102 cm | 10,8 | — | — | 5,3/10 * | 15 km/h | 650 €* | |
| Unifoil | ≈ 2026 | 967 cm² | 89 cm | 8,2 | 142 mm | — | 6,2/10 * | 15 km/h | ≈ 727 € | |
| Lift Foils | ≈ 2026 | 968 cm² | 76 cm | 6 | — | — | 7,2/10 * | 15 km/h | ≈ 887 € | |
| Lift Foils | Havoc 150↗ | ≈ 2024 | 968 cm² | 86 cm | 7,6 | — | — | 6,4/10 * | 15 km/h | ≈ 887 € |
| Lift Foils | ≈ 2026 | 968 cm² | 99 cm | 10,1 | — | — | 5,5/10 * | 15 km/h | ≈ 887 € | |
| Armstrong | 2026 | 970 cm² | 111 cm | 12,6 | — | — | 4,8/10 * | 15 km/h | 1 219 €* | |
| Armstrong | 2024 | 980 cm² | 97 cm | 9,7 | — | — | 5,6/10 * | 15 km/h | 929 €* | |
| Indiana | ≈ 2026 | 980 cm² | 129 cm | 16,9 | 117 mm | 12 mm | 4,7/10 | 15 km/h | 939 € | |
| KT Foiling | ≈ 2024 | 980 cm² | 95 cm | 9,2 | — | — | 5,7/10 * | 15 km/h | 625 €* | |
| Naish | 2024 | 980 cm² | 64 cm | 4,2 | — | — | 8,4/10 * | 15 km/h | ≈ 227 € | |
| Code Foils | ≈ 2025 | 985 cm² | 90 cm | 8,2 | — | — | 6,1/10 * | 15 km/h | 1 180 €* | |
| Armstrong | 2025 | 990 cm² | 91 cm | 8,3 | — | — | 6/10 * | 15 km/h | 969 €* | |
| Code Foils | ≈ 2026 | 990 cm² | 125 cm | 15,8 | — | — | 4/10 * | 15 km/h | 1 449 €* | |
| Ensis | ≈ 2026 | 990 cm² | 86 cm | 7,5 | 145 mm | — | 6,4/10 * | 15 km/h | 829 € | |
| F-One | 2026 | 990 cm² | 97 cm | 9,5 | — | — | 5,6/10 * | 15 km/h | 1 159 € | |
| Indiana | 2024 | 990 cm² | 86 cm | 7,5 | 145 mm | 15 mm | 6,7/10 | 15 km/h | 759 €* | |
| Axis | 2024 | 996 cm² | 116 cm | 13,5 | 117 mm | — | 4,4/10 * | 15 km/h | ≈ 971 € | |
| Sabfoil | 2025 | 998 cm² | 91 cm | 8,2 | 161 mm | 17 mm | 6/10 | 15 km/h | 749 € | |
| AFS | 2024 | 1 000 cm² | 105 cm | 11 | 130 mm | 15,5 mm | 5,2/10 | 14 km/h | 889 € | |
| AFS | ≈ 2025 | 1 000 cm² | 110 cm | 12,1 | 135 mm | 16 mm | 4,9/10 | 14 km/h | 829 € | |
| Cabrinha | 2026 | 1 000 cm² | 90 cm | 8,1 | 178 mm | — | 6/10 * | 15 km/h | 769 € | |
| Duotone | 2025 | 1 000 cm² | 92 cm | 8,5 | — | — | 5,9/10 * | 15 km/h | 325 € | |
| Eleveight | ≈ 2026 | 1 000 cm² | — | — | — | — | — | 15 km/h | 569 € | |
| F-One | 2026 | 1 000 cm² | 110 cm | 12 | — | — | 4,8/10 * | 15 km/h | 1 159 € | |
| GONG | 2024 | 1 000 cm² | 101 cm | 10,2 | 133 mm | 11 mm | 6,4/10 | 15 km/h | 379 € | |
| Naish | 2027 | 1 000 cm² | — | — | — | — | — | 15 km/h | ≈ 332 € | |
| Naish | 2026 | 1 000 cm² | 92 cm | 8,5 | — | — | 5,9/10 * | 15 km/h | ≈ 700 € | |
| Sabfoil | 2025 | 1 000 cm² | 91 cm | 8,3 | 161 mm | 17 mm | 5,9/10 | 15 km/h | 429 € | |
| Slingshot | ≈ 2025 | 1 000 cm² | 105 cm | 11 | — | — | 5/10 * | 15 km/h | 889 € | |
| Unifoil | ≈ 2026 | 1 000 cm² | 97 cm | 9,4 | 120 mm | — | 5,6/10 * | 15 km/h | ≈ 484 € | |
| GONG | 2024 | 1 010 cm² | 92 cm | 8,4 | 140 mm | 14,7 mm | 6,2/10 | 15 km/h | 319 € | |
| GONG | 2024 | 1 010 cm² | 92 cm | 8,4 | 140 mm | 14,7 mm | 6,2/10 | 15 km/h | 185 € | |
| GONG | 2026 | 1 010 cm² | 92 cm | 8,4 | 140 mm | 14,7 mm | 6,2/10 | 15 km/h | 269 € | |
| GONG | 2026 | 1 010 cm² | 94 cm | 8,7 | 144 mm | 15,5 mm | 5,9/10 | 15 km/h | 459 € | |
| F-One | 2026 | 1 020 cm² | 89 cm | 7,7 | — | — | 6,1/10 * | 14 km/h | 1 199 € | |
| Axis | 2024 | 1 038 cm² | 100 cm | 9,6 | 135 mm | — | 5,3/10 * | 14 km/h | ≈ 653 € | |
| GONG | 2026 | 1 040 cm² | 105 cm | 10,6 | 141 mm | 15,1 mm | 5,2/10 | 14 km/h | 499 € | |
| GONG | 2024 | 1 040 cm² | 103 cm | 10,2 | 130 mm | 13,7 mm | 5,6/10 | 14 km/h | 349 € | |
| GONG | 2026 | 1 040 cm² | 103 cm | 10,2 | 138 mm | 14,5 mm | 5,5/10 | 14 km/h | 289 € | |
| Naish | 2026 | 1 040 cm² | 98 cm | 9,2 | — | — | 5,4/10 * | 14 km/h | ≈ 287 € | |
| Phantom | ≈ 2027 | 1 040 cm² | 97 cm | 9 | — | — | 5,5/10 * | 14 km/h | 599 € | |
| Naish | 2026 | 1 044 cm² | 103 cm | 10,2 | — | — | 5,1/10 * | 14 km/h | ≈ 782 € | |
| AFS | 2026 | 1 050 cm² | 97 cm | 9 | 148 mm | 17,7 mm | 5,3/10 | 14 km/h | 899 € | |
| Core | ≈ 2026 | 1 050 cm² | 96 cm | 8,8 | — | — | 5,5/10 * | 14 km/h | 819 € | |
| Core | ≈ 2026 | 1 050 cm² | 100 cm | 9,5 | — | — | 5,2/10 * | 14 km/h | 479 € | |
| Duotone | 2026 | 1 050 cm² | 96 cm | 8,8 | — | — | 5,5/10 * | 14 km/h | 989 € | |
| Duotone | 2027 | 1 050 cm² | 96 cm | 8,8 | — | — | 5,5/10 * | 14 km/h | 659 € | |
| Eleveight | ≈ 2026 | 1 050 cm² | — | — | — | — | — | 14 km/h | 1 439 € | |
| F-One | 2026 | 1 050 cm² | 92 cm | 8 | — | — | 5,8/10 * | 14 km/h | 989 € | |
| GONG | 2026 | 1 050 cm² | 122 cm | 14,2 | 120 mm | 15,3 mm | 4,2/10 | 14 km/h | 579 € | |
| GONG | 2024 | 1 050 cm² | 118 cm | 13,3 | 118 mm | 14,3 mm | 4,6/10 | 14 km/h | 405 € | |
| GONG | 2026 | 1 050 cm² | 115 cm | 12,6 | 134 mm | 17 mm | 4,3/10 | 14 km/h | 519 € | |
| Indiana | 2025 | 1 050 cm² | 105 cm | 10,5 | 142 mm | 14,2 mm | 5,4/10 | 14 km/h | 529 €* | |
| Ketos | 2026 | 1 050 cm² | 95 cm | 8,6 | — | — | 5,6/10 * | 14 km/h | 760 € | |
| Naish | 2026 | 1 050 cm² | — | — | — | — | — | 14 km/h | ≈ 222 € | |
| Naish | 2024 | 1 050 cm² | 79 cm | 5,9 | — | — | 6,9/10 * | 14 km/h | ≈ 375 € | |
| North | 2024 | 1 050 cm² | 85 cm | 6,9 | — | — | 6,3/10 * | 14 km/h | 696 € | |
| Takoon | 2024 | 1 050 cm² | 95 cm | 8,6 | 147 mm | 16,7 mm | 5,6/10 | 14 km/h | 337 € | |
| Takoon | ≈ 2026 | 1 050 cm² | 98 cm | 9,1 | 149 mm | 17 mm | 5,3/10 | 14 km/h | 458 € | |
| Takoon | 2025 | 1 050 cm² | 105 cm | 10,5 | 156 mm | 17 mm | 4,9/10 | 14 km/h | 450 € | |
| Takoon | 2024 | 1 050 cm² | 110 cm | 11,5 | 120 mm | 18,6 mm | 4,3/10 | 13 km/h | 449 € | |
| Takoon | 2024 | 1 050 cm² | 87 cm | 7,2 | 157 mm | 21 mm | 5,5/10 | 13 km/h | 319 € | |
| Sabfoil | ≈ 2024 | 1 061 cm² | 108 cm | 10,9 | 124 mm | 17 mm | 4,7/10 | 13 km/h | 419 € | |
| Alpinefoil | ≈ 2024 | 1 063 cm² | 117 cm | 12,8 | — | — | 4,2/10 * | 14 km/h | 849 € | |
| Sabfoil | 2025 | 1 069 cm² | 108 cm | 10,9 | 124 mm | 17 mm | 4,7/10 | 13 km/h | 769 € | |
| Armstrong | 2026 | 1 070 cm² | 116 cm | 12,6 | — | — | 4,2/10 * | 14 km/h | 1 269 €* | |
| GONG | 2024 | 1 070 cm² | 95 cm | 8,4 | 145 mm | 16,8 mm | 5,5/10 | 14 km/h | 319 € | |
| GONG | 2024 | 1 070 cm² | 95 cm | 8,4 | 145 mm | 16,8 mm | 5,5/10 | 14 km/h | 185 € | |
| GONG | 2026 | 1 070 cm² | 95 cm | 8,4 | 145 mm | 16,8 mm | 5,5/10 | 14 km/h | 269 € | |
| GONG | 2026 | 1 070 cm² | 95 cm | 8,4 | 147 mm | 16,4 mm | 5,6/10 | 14 km/h | 459 € | |
| Axis | 2025 | 1 076 cm² | 101 cm | 9,5 | 141 mm | 16,4 mm | 5,2/10 | 14 km/h | ≈ 749 € | |
| GONG | 2026 | 1 077 cm² | 87 cm | 7 | 157 mm | 18,5 mm | 5,8/10 | 14 km/h | 249 € | |
| Armstrong | 2024 | 1 080 cm² | 102 cm | 9,6 | — | — | 5,1/10 * | 14 km/h | 969 €* | |
| Ensis | ≈ 2026 | 1 080 cm² | 101 cm | 9,5 | 148 mm | — | 5,1/10 * | 14 km/h | 989 € | |
| GONG | 2024 | 1 080 cm² | 87 cm | 7 | 157 mm | 18,5 mm | 5,8/10 | 14 km/h | 169 € | |
| Indiana | ≈ 2026 | 1 080 cm² | 101 cm | 9,5 | 148 mm | 13,7 mm | 5,6/10 | 15 km/h | 809 €* | |
| Code Foils | ≈ 2025 | 1 085 cm² | 94 cm | 8,1 | — | — | 5,6/10 * | 14 km/h | 1 220 €* | |
| F-One | 2026 | 1 090 cm² | 102 cm | 9,5 | — | — | 5/10 * | 14 km/h | 1 199 € | |
| Unifoil | ≈ 2026 | 1 096 cm² | 95 cm | 8,2 | 151 mm | — | 5,5/10 * | 14 km/h | ≈ 773 € | |
| GoFoil | ≈ 2025 | 1 097 cm² | 104 cm | 9,9 | 111 mm | — | 4,9/10 * | 14 km/h | ≈ 773 € | |
| Unifoil | ≈ 2026 | 1 097 cm² | 95 cm | 8,3 | 122 mm | — | 5,5/10 * | 14 km/h | ≈ 682 € | |
| AFS | 2024 | 1 100 cm² | 110 cm | 11 | 136 mm | 16,2 mm | 4,6/10 | 14 km/h | 909 € | |
| Alpinefoil | 2025 | 1 100 cm² | 112 cm | 11,4 | 142 mm | — | 4,4/10 * | 14 km/h | 779 € | |
| Duotone | 2025 | 1 100 cm² | 86 cm | 6,7 | — | — | 6,1/10 * | 14 km/h | 949 € | |
| Duotone | 2025 | 1 100 cm² | 86 cm | 6,7 | — | — | 6,1/10 * | 14 km/h | 629 € | |
| Duotone | 2025 | 1 100 cm² | 106 cm | 10,2 | — | — | 4,8/10 * | 14 km/h | 419 € | |
| Duotone | 2027 | 1 100 cm² | 112 cm | 11,4 | — | — | 4,4/10 * | 14 km/h | 999 € | |
| Duotone | 2027 | 1 100 cm² | 112 cm | 11,4 | — | — | 4,4/10 * | 14 km/h | 669 € | |
| F-One | 2026 | 1 100 cm² | 94 cm | 8 | — | — | 5,5/10 * | 14 km/h | 879 € | |
| GONG | 2024 | 1 100 cm² | 84 cm | 6,4 | 168 mm | 19,7 mm | 5,9/10 | 14 km/h | 149 € | |
| Naish | 2024 | 1 100 cm² | 89 cm | 7,2 | — | — | 5,9/10 * | 14 km/h | ≈ 354 € | |
| North | ≈ 2024 | 1 100 cm² | 115 cm | 12 | — | — | 4,2/10 * | 14 km/h | 839 € | |
| Omen | ≈ 2025 | 1 100 cm² | 107 cm | 10,4 | — | — | 4,7/10 * | 14 km/h | 680 € | |
| Sroka | ≈ 2024 | 1 100 cm² | 110 cm | 11 | 130 mm | 15,8 mm | 4,7/10 | 13 km/h | 780 € | |
| GONG | 2026 | 1 108 cm² | 84 cm | 6,4 | 168 mm | 19,7 mm | 5,8/10 | 14 km/h | 219 € | |
| KT Foiling | ≈ 2026 | 1 110 cm² | 125 cm | 14,1 | — | — | 3,7/10 * | 14 km/h | 1 350 €* | |
| KT Foiling | 2025 | 1 120 cm² | 97 cm | 8,4 | — | — | 5,3/10 * | 14 km/h | 475 €* | |
| Ketos | ≈ 2025 | 1 122 cm² | 122 cm | 13,3 | 145 mm | 18 mm | 3,6/10 | 13 km/h | 930 € | |
| Slingshot | ≈ 2025 | 1 125 cm² | 100 cm | 8,9 | — | — | 5,1/10 * | 14 km/h | 899 € | |
| Unifoil | ≈ 2026 | 1 129 cm² | 103 cm | 9,4 | 128 mm | — | 4,9/10 * | 14 km/h | ≈ 504 € | |
| KT Foiling | ≈ 2024 | 1 130 cm² | 111 cm | 10,9 | — | — | 4,4/10 * | 14 km/h | 670 €* | |
| Axis | 2024 | 1 133 cm² | 125 cm | 13,8 | 123 mm | — | 3,7/10 * | 14 km/h | ≈ 1 020 € | |
| Ensis | ≈ 2026 | 1 140 cm² | 93 cm | 7,5 | 155 mm | — | 5,6/10 * | 14 km/h | 859 € | |
| Indiana | 2024 | 1 140 cm² | 93 cm | 7,5 | 155 mm | 16 mm | 5,7/10 | 14 km/h | 779 €* | |
| Axis | 2026 | 1 142 cm² | 108 cm | 10,2 | 140 mm | 16,2 mm | 4,6/10 | 13 km/h | ≈ 809 € | |
| Naish | 2026 | 1 144 cm² | 108 cm | 10,2 | — | — | 4,6/10 * | 14 km/h | ≈ 809 € | |
| AFS | 2026 | 1 150 cm² | 102 cm | 9 | 156 mm | 18,7 mm | 4,6/10 | 13 km/h | 929 € | |
| Cabrinha | ≈ 2026 | 1 150 cm² | 112 cm | 10,9 | 143 mm | — | 4,3/10 * | 13 km/h | 919 € | |
| F-One | 2026 | 1 150 cm² | 96 cm | 8 | — | — | 5,3/10 * | 13 km/h | 1 019 € | |
| GONG | 2026 | 1 150 cm² | 112 cm | 10,9 | 140 mm | 19,7 mm | 3,9/10 | 13 km/h | 459 € | |
| GONG | 2026 | 1 150 cm² | 110 cm | 10,5 | 148 mm | 15,9 mm | 4,6/10 | 14 km/h | 519 € | |
| GONG | 2024 | 1 150 cm² | 108 cm | 10,1 | 137 mm | 14,4 mm | 4,9/10 | 14 km/h | 359 € | |
| GONG | 2026 | 1 150 cm² | 108 cm | 10,1 | 146 mm | 15,3 mm | 4,8/10 | 14 km/h | 319 € | |
| Cabrinha | ≈ 2026 | 1 160 cm² | 108 cm | 10 | 152 mm | — | 4,5/10 * | 13 km/h | 799 € | |
| GONG | 2024 | 1 160 cm² | 99 cm | 8,4 | 151 mm | 15,8 mm | 5,2/10 | 14 km/h | 325 € | |
| GONG | 2024 | 1 160 cm² | 99 cm | 8,4 | 151 mm | 15,8 mm | 5,2/10 | 14 km/h | 199 € | |
| GONG | 2026 | 1 160 cm² | 99 cm | 8,4 | 151 mm | 15,8 mm | 5,2/10 | 14 km/h | 289 € | |
| GONG | 2026 | 1 160 cm² | 100 cm | 8,6 | 155 mm | 16,6 mm | 5/10 | 14 km/h | 469 € | |
| KT Foiling | ≈ 2024 | 1 160 cm² | 105 cm | 9,5 | — | — | 4,7/10 * | 13 km/h | 660 €* | |
| Lift Foils | ≈ 2026 | 1 161 cm² | 107 cm | 9,9 | — | — | 4,6/10 * | 13 km/h | ≈ 965 € | |
| Roam | ≈ 2024 | 1 179 cm² | 93 cm | 7,3 | — | — | 5,5/10 * | 13 km/h | ≈ 381 € | |
| Armstrong | 2024 | 1 180 cm² | 107 cm | 9,6 | — | — | 4,6/10 * | 13 km/h | 1 009 €* | |
| Armstrong | 2025 | 1 190 cm² | 99 cm | 8,2 | — | — | 5/10 * | 13 km/h | 1 009 €* | |
| F-One | 2026 | 1 190 cm² | 106 cm | 9,4 | — | — | 4,6/10 * | 13 km/h | 1 249 € | |
| Code Foils | ≈ 2025 | 1 195 cm² | 99 cm | 8,2 | — | — | 5/10 * | 13 km/h | 1 270 €* | |
| Axis | 2024 | 1 197 cm² | 110 cm | 10,1 | 146 mm | — | 4,3/10 * | 13 km/h | ≈ 712 € | |
| Axis | 2026 | 1 199 cm² | 115 cm | 11 | 138 mm | 16 mm | 4,2/10 | 13 km/h | ≈ 890 € | |
| Duotone | 2026 | 1 200 cm² | 102 cm | 8,7 | — | — | 4,8/10 * | 13 km/h | 1 039 € | |
| Duotone | 2027 | 1 200 cm² | 102 cm | 8,7 | — | — | 4,8/10 * | 13 km/h | 709 € | |
| Duotone | 2025 | 1 200 cm² | 99 cm | 8,2 | — | — | 5/10 * | 13 km/h | 350 € | |
| F-One | 2026 | 1 200 cm² | 98 cm | 8 | — | — | 5,1/10 * | 13 km/h | 889 € | |
| GONG | 2026 | 1 200 cm² | 130 cm | 14,1 | 128 mm | 16,3 mm | 3,3/10 | 13 km/h | 599 € | |
| GONG | 2024 | 1 200 cm² | 126 cm | 13,2 | 126 mm | 15,3 mm | 3,7/10 | 13 km/h | 419 € | |
| GONG | 2026 | 1 200 cm² | 123 cm | 12,6 | 143 mm | 18,2 mm | 3,4/10 | 13 km/h | 549 € | |
| GONG | 2024 | 1 200 cm² | 111 cm | 10,3 | 146 mm | 12 mm | 5,2/10 | 14 km/h | 405 € | |
| Naish | 2027 | 1 200 cm² | — | — | — | — | — | 13 km/h | ≈ 359 € | |
| Naish | 2026 | 1 200 cm² | 100 cm | 8,3 | — | — | 5/10 * | 13 km/h | ≈ 727 € | |
| North | 2024 | 1 200 cm² | 88 cm | 6,4 | — | — | 5,8/10 * | 13 km/h | 715 € | |
| North | 2024 | 1 200 cm² | 88 cm | 6,4 | — | — | 5,8/10 * | 13 km/h | 469 € | |
| Phantom | ≈ 2027 | 1 200 cm² | 102 cm | 8,7 | — | — | 4,8/10 * | 13 km/h | 619 € | |
| Slingshot | ≈ 2025 | 1 200 cm² | 115 cm | 11 | — | — | 4,1/10 * | 13 km/h | 909 € | |
| Starboard | 2026 | 1 200 cm² | — | — | — | — | — | 13 km/h | 899 € | |
| Takoon | 2024 | 1 200 cm² | 102 cm | 8,6 | 158 mm | 18,4 mm | 4,6/10 | 13 km/h | 359 € | |
| Takoon | ≈ 2026 | 1 200 cm² | 105 cm | 9,2 | 160 mm | 18 mm | 4,4/10 | 13 km/h | 476 € | |
| Takoon | 2025 | 1 200 cm² | 113 cm | 10,6 | 168 mm | 18 mm | 4/10 | 13 km/h | 477 € | |
| Sabfoil | 2025 | 1 210 cm² | 97 cm | 7,7 | 186 mm | 19 mm | 4,8/10 | 13 km/h | 759 € | |
| GONG | 2024 | 1 220 cm² | 101 cm | 8,4 | 155 mm | 18 mm | 4,6/10 | 13 km/h | 325 € | |
| GONG | 2024 | 1 220 cm² | 101 cm | 8,4 | 155 mm | 18 mm | 4,6/10 | 13 km/h | 199 € | |
| GONG | 2026 | 1 220 cm² | 101 cm | 8,4 | 155 mm | 18 mm | 4,6/10 | 13 km/h | 289 € | |
| GONG | 2026 | 1 220 cm² | 101 cm | 8,4 | 157 mm | 17,4 mm | 4,7/10 | 13 km/h | 469 € | |
| Sabfoil | 2025 | 1 230 cm² | 97 cm | 7,6 | 186 mm | 19 mm | 4,8/10 | 13 km/h | 449 € | |
| Ketos | ≈ 2024 | 1 238 cm² | 108 cm | 9,4 | 155 mm | 15,1 mm | 4,7/10 | 13 km/h | 795 € | |
| AFS | 2024 | 1 240 cm² | 97 cm | 7,6 | 185 mm | 16,5 mm | 5,1/10 | 14 km/h | 519 € | |
| Naish | 2026 | 1 240 cm² | 103 cm | 8,6 | — | — | 4,7/10 * | 13 km/h | ≈ 305 € | |
| Armstrong | ≈ 2024 | 1 250 cm² | 85 cm | 5,8 | — | — | 6/10 * | 13 km/h | 509 €* | |
| Cabrinha | ≈ 2026 | 1 250 cm² | 94 cm | 7 | 182 mm | — | 5,3/10 * | 13 km/h | 739 € | |
| Core | ≈ 2026 | 1 250 cm² | 100 cm | 8 | — | — | 4,9/10 * | 13 km/h | 849 € | |
| Core | ≈ 2026 | 1 250 cm² | 89 cm | 6,3 | — | — | 5,6/10 * | 13 km/h | 579 € | |
| Duotone | 2027 | 1 250 cm² | 118 cm | 11,1 | — | — | 3,8/10 * | 13 km/h | 719 € | |
| Eleveight | ≈ 2026 | 1 250 cm² | — | — | — | — | — | 13 km/h | 1 479 € | |
| Ensis | ≈ 2026 | 1 250 cm² | 86 cm | 6 | 180 mm | — | 5,9/10 * | 13 km/h | 513 € | |
| Naish | 2026 | 1 250 cm² | — | — | — | — | — | 13 km/h | ≈ 241 € | |
| Naish | 2024 | 1 250 cm² | 84 cm | 5,6 | — | — | 6,1/10 * | 13 km/h | ≈ 282 € | |
| Slingshot | ≈ 2025 | 1 250 cm² | 82 cm | 5,3 | — | — | 6,2/10 * | 13 km/h | 649 € | |
| Takoon | 2024 | 1 250 cm² | 95 cm | 7,2 | 171 mm | 23 mm | 4,3/10 | 12 km/h | 330 € | |
| Indiana | 2026 | 1 252 cm² | 117 cm | 10,9 | 153 mm | 15,1 mm | 4,1/10 | 13 km/h | 549 €* | |
| Alpinefoil | ≈ 2024 | 1 260 cm² | 125 cm | 12,4 | — | — | 3,4/10 * | 13 km/h | 889 € | |
| Ensis | ≈ 2026 | 1 260 cm² | 101 cm | 8,1 | 160 mm | — | 4,8/10 * | 13 km/h | 1 059 € | |
| Indiana | ≈ 2026 | 1 260 cm² | 109 cm | 9,5 | 160 mm | 14,8 mm | 4,6/10 | 13 km/h | 839 €* | |
| Sroka | ≈ 2024 | 1 260 cm² | 118 cm | 11 | 136 mm | 16,4 mm | 3,8/10 | 13 km/h | 799 € | |
| Armstrong | 2026 | 1 270 cm² | 127 cm | 12,6 | — | — | 3,3/10 * | 13 km/h | 1 329 €* | |
| GoFoil | ≈ 2025 | 1 277 cm² | 104 cm | 8,5 | 172 mm | — | 4,5/10 * | 13 km/h | ≈ 791 € | |
| F-One | ≈ 2024 | 1 280 cm² | 87 cm | 5,9 | — | — | 5,8/10 * | 13 km/h | 279 € | |
| F-One | 2026 | 1 290 cm² | 111 cm | 9,5 | — | — | 4,1/10 * | 13 km/h | 1 299 € | |
| GONG | 2024 | 1 290 cm² | 95 cm | 7 | 172 mm | 20,2 mm | 4,6/10 | 13 km/h | 179 € | |
| Unifoil | ≈ 2026 | 1 290 cm² | 101 cm | 7,9 | 133 mm | — | 4,7/10 * | 13 km/h | ≈ 773 € | |
| GONG | 2026 | 1 291 cm² | 95 cm | 7 | 172 mm | 20,2 mm | 4,6/10 | 13 km/h | 259 € | |
| AFS | 2024 | 1 300 cm² | 119 cm | 10,9 | 149 mm | 17,8 mm | 3,5/10 | 12 km/h | 939 € | |
| Duotone | 2025 | 1 300 cm² | 92 cm | 6,5 | — | — | 5,3/10 * | 13 km/h | 679 € | |
| Duotone | 2026 | 1 300 cm² | 97 cm | 7,2 | — | — | 5/10 * | 13 km/h | 459 € | |
| F-One | 2026 | 1 300 cm² | 102 cm | 8 | — | — | 4,6/10 * | 13 km/h | 899 € | |
| GONG | 2026 | 1 300 cm² | 117 cm | 10,5 | 158 mm | 16,9 mm | 3,7/10 | 13 km/h | 539 € | |
| GONG | 2024 | 1 300 cm² | 115 cm | 10,2 | 145 mm | 15,3 mm | 4,1/10 | 13 km/h | 375 € | |
| GONG | 2026 | 1 300 cm² | 115 cm | 10,2 | 155 mm | 16,2 mm | 4/10 | 13 km/h | 349 € | |
| KT Foiling | 2025 | 1 300 cm² | 97 cm | 7,2 | — | — | 5/10 * | 13 km/h | 475 €* | |
| Axis | 2024 | 1 309 cm² | 135 cm | 13,9 | 132 mm | — | 2,8/10 * | 13 km/h | ≈ 1 072 € | |
| GONG | 2024 | 1 310 cm² | 105 cm | 8,4 | 160 mm | 16,8 mm | 4,4/10 | 13 km/h | 339 € | |
| GONG | 2024 | 1 310 cm² | 105 cm | 8,4 | 160 mm | 16,8 mm | 4,4/10 | 13 km/h | 209 € | |
| GONG | 2026 | 1 310 cm² | 105 cm | 8,4 | 160 mm | 16,8 mm | 4,4/10 | 13 km/h | 299 € | |
| GONG | 2026 | 1 310 cm² | 107 cm | 8,7 | 165 mm | 17,7 mm | 4,2/10 | 13 km/h | 489 € | |
| Ketos | 2026 | 1 320 cm² | 120 cm | 10,9 | 145 mm | 19,5 mm | 3,1/10 | 12 km/h | 1 499 € | |
| Unifoil | ≈ 2026 | 1 323 cm² | 111 cm | 9,4 | 138 mm | — | 4/10 * | 13 km/h | ≈ 545 € | |
| Axis | 2025 | 1 324 cm² | 150 cm | 17 | 128 mm | — | 2,2/10 * | 13 km/h | ≈ 1 179 € | |
| Slingshot | ≈ 2025 | 1 325 cm² | 110 cm | 9,1 | — | — | 4,1/10 * | 13 km/h | 949 € | |
| Sabfoil | 2026 | 1 330 cm² | 128 cm | 12,3 | 161 mm | 16,7 mm | 3,1/10 | 13 km/h | 819 € | |
| Axis | 2026 | 1 339 cm² | 124 cm | 11,5 | 142 mm | 16,5 mm | 3,4/10 | 12 km/h | ≈ 970 € | |
| Ketos | ≈ 2025 | 1 340 cm² | 133 cm | 13,2 | 150 mm | 18,6 mm | 2,6/10 | 12 km/h | 930 € | |
| KT Foiling | ≈ 2024 | 1 340 cm² | 122 cm | 11,1 | — | — | 3,4/10 * | 12 km/h | 690 €* | |
| Naish | 2026 | 1 344 cm² | 117 cm | 10,2 | — | — | 3,7/10 * | 12 km/h | ≈ 864 € | |
| Sabfoil | 2026 | 1 345 cm² | 116 cm | 9,9 | 176 mm | 18,2 mm | 3,5/10 | 13 km/h | 769 € | |
| Duotone | 2025 | 1 350 cm² | 116 cm | 10 | — | — | 3,7/10 * | 12 km/h | 454 € | |
| Takoon | ≈ 2026 | 1 350 cm² | 110 cm | 9 | 166 mm | 19 mm | 3,7/10 | 12 km/h | 494 € | |
| Ensis | ≈ 2026 | 1 360 cm² | 110 cm | 8,9 | 196 mm | — | 4,1/10 * | 12 km/h | 929 € | |
| GONG | 2024 | 1 370 cm² | 107 cm | 8,4 | 164 mm | 19 mm | 3,9/10 | 12 km/h | 339 € | |
| GONG | 2024 | 1 370 cm² | 107 cm | 8,4 | 164 mm | 19 mm | 3,9/10 | 12 km/h | 209 € | |
| GONG | 2026 | 1 370 cm² | 108 cm | 8,5 | 164 mm | 19 mm | 3,8/10 | 12 km/h | 299 € | |
| GONG | 2026 | 1 370 cm² | 107 cm | 8,4 | 166 mm | 18,5 mm | 3,9/10 | 12 km/h | 489 € | |
| Phantom | ≈ 2027 | 1 380 cm² | 108 cm | 8,4 | — | — | 4,2/10 * | 12 km/h | 639 € | |
| Armstrong | 2025 | 1 390 cm² | 106 cm | 8,1 | — | — | 4,3/10 * | 12 km/h | 1 069 €* | |
| Code Foils | ≈ 2026 | 1 390 cm² | 130 cm | 12,2 | — | — | 2,9/10 * | 12 km/h | 1 150 €* | |
| Ensis | ≈ 2026 | 1 390 cm² | 102 cm | 7,5 | 170 mm | — | 4,5/10 * | 12 km/h | 879 € | |
| Indiana | 2024 | 1 390 cm² | 102 cm | 7,5 | 170 mm | 17,5 mm | 4,4/10 | 12 km/h | 799 €* | |
| Alpinefoil | ≈ 2024 | 1 400 cm² | 132 cm | 12,4 | — | — | 2,8/10 * | 12 km/h | 899 € | |
| Duotone | 2027 | 1 400 cm² | 124 cm | 11 | — | — | 3,2/10 * | 12 km/h | 769 € | |
| F-One | 2026 | 1 400 cm² | 120 cm | 10,3 | — | — | 3,4/10 * | 12 km/h | 999 € | |
| F-One | 2026 | 1 400 cm² | 106 cm | 8 | — | — | 4,3/10 * | 12 km/h | 929 € | |
| GONG | 2026 | 1 400 cm² | 124 cm | 11 | 155 mm | 21,8 mm | 2,5/10 | 11 km/h | 499 € | |
| GONG | 2026 | 1 400 cm² | 133 cm | 12,6 | 155 mm | 19,7 mm | 2,3/10 | 12 km/h | 579 € | |
| GONG | 2024 | 1 400 cm² | 95 cm | 6,4 | 189 mm | 22,3 mm | 4,2/10 | 12 km/h | 169 € | |
| Naish | 2026 | 1 400 cm² | 107 cm | 8,2 | — | — | 4,2/10 * | 12 km/h | ≈ 754 € | |
| North | ≈ 2024 | 1 400 cm² | 125 cm | 11,2 | — | — | 3,2/10 * | 12 km/h | 859 € | |
| Takoon | 2024 | 1 400 cm² | 110 cm | 8,6 | 166 mm | 20,6 mm | 3,4/10 | 12 km/h | 375 € | |
| GONG | 2026 | 1 410 cm² | 95 cm | 6,4 | 189 mm | 22,3 mm | 4,2/10 | 12 km/h | 249 € | |
| Axis | 2024 | 1 423 cm² | 110 cm | 8,5 | 160 mm | — | 4/10 * | 12 km/h | ≈ 739 € | |
| AFS | ≈ 2024 | 1 430 cm² | 96 cm | 6,4 | 185 mm | 20 mm | 4,4/10 | 12 km/h | 429 € | |
| AFS | 2024 | 1 440 cm² | 104 cm | 7,5 | 195 mm | 17,5 mm | 4,2/10 | 13 km/h | 539 € | |
| Naish | 2026 | 1 440 cm² | 107 cm | 8 | — | — | 4,1/10 * | 12 km/h | ≈ 323 € | |
| GONG | 2026 | 1 442 cm² | 116 cm | 9,3 | 170 mm | 22 mm | 2,8/10 | 12 km/h | 359 € | |
| Duotone | 2025 | 1 450 cm² | 107 cm | 7,9 | — | — | 4,1/10 * | 12 km/h | 375 € | |
| Eleveight | ≈ 2026 | 1 450 cm² | — | — | — | — | — | 12 km/h | 1 519 € | |
| GONG | 2024 | 1 450 cm² | 116 cm | 9,3 | 170 mm | 23 mm | 2,7/10 | 11 km/h | 349 € | |
| Ketos | ≈ 2024 | 1 450 cm² | 116 cm | 9,3 | 166 mm | 17,3 mm | 3,5/10 | 12 km/h | 810 € | |
| KT Foiling | 2025 | 1 450 cm² | 96 cm | 6,4 | — | — | 4,8/10 * | 12 km/h | 475 €* | |
| Naish | 2026 | 1 450 cm² | 88 cm | 5,4 | — | — | 5,4/10 * | 12 km/h | ≈ 305 € | |
| Naish | 2024 | 1 450 cm² | 88 cm | 5,4 | — | — | 5,4/10 * | 12 km/h | ≈ 309 € | |
| Takoon | 2024 | 1 450 cm² | 102 cm | 7,2 | 184 mm | 24 mm | 3,4/10 | 11 km/h | 350 € | |
| GONG | 2024 | 1 460 cm² | 111 cm | 8,4 | 169 mm | 17,7 mm | 3,7/10 | 12 km/h | 359 € | |
| GONG | 2024 | 1 460 cm² | 111 cm | 8,4 | 169 mm | 17,7 mm | 3,7/10 | 12 km/h | 229 € | |
| GONG | 2026 | 1 460 cm² | 111 cm | 8,4 | 169 mm | 17,7 mm | 3,7/10 | 12 km/h | 329 € | |
| GONG | 2026 | 1 460 cm² | 112 cm | 8,6 | 174 mm | 18,7 mm | 3,5/10 | 12 km/h | 519 € | |
| F-One | ≈ 2024 | 1 480 cm² | 96 cm | 6,2 | — | — | 4,8/10 * | 12 km/h | 279 € | |
| GONG | 2026 | 1 496 cm² | 102 cm | 7 | 185 mm | 21,8 mm | 3,6/10 | 12 km/h | 279 € | |
| F-One | 2026 | 1 500 cm² | 110 cm | 8 | — | — | 3,9/10 * | 12 km/h | 949 € | |
| GONG | 2024 | 1 500 cm² | 102 cm | 6,9 | 185 mm | 21,8 mm | 3,6/10 | 12 km/h | 195 € | |
| North | 2024 | 1 500 cm² | 92 cm | 5,6 | — | — | 5,1/10 * | 12 km/h | 725 € | |
| North | 2024 | 1 500 cm² | 92 cm | 5,6 | — | — | 5,1/10 * | 12 km/h | 479 € | |
| Sroka | ≈ 2026 | 1 500 cm² | 141 cm | 13,3 | 136 mm | 19 mm | 1,9/10 | 11 km/h | 679 € | |
| Sroka | ≈ 2026 | 1 500 cm² | — | — | — | — | — | 12 km/h | 369 € | |
| Unifoil | ≈ 2026 | 1 516 cm² | 119 cm | 9,4 | 148 mm | — | 3,3/10 * | 12 km/h | ≈ 579 € | |
| GONG | 2024 | 1 520 cm² | 113 cm | 8,4 | 173 mm | 20 mm | 3,1/10 | 12 km/h | 359 € | |
| GONG | 2024 | 1 520 cm² | 113 cm | 8,4 | 173 mm | 20 mm | 3,1/10 | 12 km/h | 229 € | |
| GONG | 2026 | 1 520 cm² | 113 cm | 8,4 | 173 mm | 20 mm | 3,1/10 | 12 km/h | 329 € | |
| GONG | 2026 | 1 520 cm² | 113 cm | 8,4 | 175 mm | 19,5 mm | 3,2/10 | 12 km/h | 519 € | |
| Slingshot | ≈ 2025 | 1 525 cm² | 117 cm | 9 | — | — | 3,4/10 * | 12 km/h | 949 € | |
| Axis | 2025 | 1 531 cm² | 175 cm | 20 | 150 mm | — | 0,9/10 * | 12 km/h | ≈ 1 474 € | |
| Alpinefoil | ≈ 2024 | 1 540 cm² | 140 cm | 12,7 | — | — | 2,2/10 * | 12 km/h | 939 € | |
| Naish | 2026 | 1 544 cm² | 125 cm | 10,1 | — | — | 2,9/10 * | 12 km/h | ≈ 891 € | |
| Sabfoil | 2026 | 1 549 cm² | 138 cm | 12,3 | 173 mm | 18 mm | 2,1/10 | 12 km/h | 829 € | |
| Armstrong | ≈ 2024 | 1 550 cm² | 91 cm | 5,3 | — | — | 5,1/10 * | 12 km/h | 549 €* | |
| Core | ≈ 2026 | 1 550 cm² | 91 cm | 5,3 | — | — | 5,1/10 * | 12 km/h | 579 € | |
| Ensis | ≈ 2026 | 1 550 cm² | 96 cm | 6 | 200 mm | — | 4,7/10 * | 12 km/h | 519 € | |
| Ketos | ≈ 2026 | 1 550 cm² | — | — | — | — | — | 12 km/h | 599 € | |
| Slingshot | ≈ 2025 | 1 550 cm² | 87 cm | 4,8 | — | — | 5,4/10 * | 12 km/h | 699 € | |
| Sroka | ≈ 2024 | 1 550 cm² | 131 cm | 11 | 156 mm | 17,4 mm | 2,6/10 | 12 km/h | 829 € | |
| Axis | 2024 | 1 554 cm² | 118 cm | 9 | 165 mm | — | 3,3/10 * | 12 km/h | ≈ 783 € | |
| Cabrinha | ≈ 2026 | 1 600 cm² | 106 cm | 7 | 205 mm | — | 4/10 * | 11 km/h | 799 € | |
| Code Foils | ≈ 2026 | 1 600 cm² | 130 cm | 10,6 | — | — | 2,6/10 * | 11 km/h | 1 140 €* | |
| Duotone | 2026 | 1 600 cm² | 106 cm | 7 | — | — | 4/10 * | 11 km/h | 499 € | |
| F-One | 2026 | 1 600 cm² | 128 cm | 10,2 | — | — | 2,7/10 * | 11 km/h | 1 049 € | |
| F-One | 2026 | 1 600 cm² | 113 cm | 8 | — | — | 3,5/10 * | 11 km/h | 969 € | |
| Indiana | 2025 | 1 600 cm² | 132 cm | 10,9 | 172 mm | 17,2 mm | 2,4/10 | 12 km/h | 559 €* | |
| Naish | 2027 | 1 600 cm² | — | — | — | — | — | 11 km/h | ≈ 382 € | |
| Takoon | 2024 | 1 600 cm² | 94 cm | 5,5 | 215 mm | 29 mm | 3,3/10 | 11 km/h | 249 € | |
| Axis | 2024 | 1 632 cm² | 130 cm | 10,4 | 168 mm | — | 2,6/10 * | 11 km/h | ≈ 807 € | |
| AFS | 2024 | 1 640 cm² | 111 cm | 7,5 | 195 mm | 17,5 mm | 3,5/10 | 12 km/h | 559 € | |
| Naish | 2026 | 1 640 cm² | 110 cm | 7,4 | — | — | 3,7/10 * | 11 km/h | ≈ 332 € | |
| GONG | 2026 | 1 650 cm² | 135 cm | 11 | 170 mm | 23,9 mm | 1,3/10 | 10 km/h | 599 € | |
| Naish | 2026 | 1 650 cm² | — | — | — | — | — | 11 km/h | ≈ 282 € | |
| Naish | 2026 | 1 650 cm² | 92 cm | 5,1 | — | — | 4,9/10 * | 11 km/h | ≈ 323 € | |
| Naish | 2024 | 1 650 cm² | 92 cm | 5,1 | — | — | 4,9/10 * | 11 km/h | ≈ 318 € | |
| F-One | ≈ 2024 | 1 680 cm² | 104 cm | 6,4 | — | — | 4/10 * | 11 km/h | 279 € | |
| GONG | 2026 | 1 691 cm² | 136 cm | 10,9 | 170 mm | 22 mm | 1,5/10 | 11 km/h | 419 € | |
| Alpinefoil | 2025 | 1 698 cm² | 150 cm | 13,2 | 165 mm | 16 mm | 1,7/10 | 11 km/h | 965 € | |
| GONG | 2024 | 1 700 cm² | 136 cm | 10,9 | 170 mm | 23 mm | 1,3/10 | 10 km/h | 419 € | |
| Takoon | 2024 | 1 700 cm² | 111 cm | 7,2 | 199 mm | 26 mm | 2,3/10 | 11 km/h | 370 € | |
| AFS | ≈ 2024 | 1 735 cm² | 105 cm | 6,4 | 205 mm | 22 mm | 3,1/10 | 11 km/h | 439 € | |
| Ensis | ≈ 2026 | 1 740 cm² | 126 cm | 9,1 | 176 mm | — | 2,6/10 * | 11 km/h | 979 € | |
| GONG | 2026 | 1 747 cm² | 106 cm | 6,4 | 210 mm | 24,8 mm | 2,7/10 | 11 km/h | 279 € | |
| GONG | 2024 | 1 750 cm² | 106 cm | 6,4 | 210 mm | 24,8 mm | 2,7/10 | 11 km/h | 195 € | |
| Sroka | ≈ 2026 | 1 750 cm² | 152 cm | 13,2 | 147 mm | 21 mm | 0,8/10 | 10 km/h | 770 € | |
| Sroka | ≈ 2026 | 1 750 cm² | — | — | — | — | — | 11 km/h | 369 € | |
| Ketos | ≈ 2025 | 1 770 cm² | 133 cm | 10 | 170 mm | 22 mm | 1,5/10 | 10 km/h | 699 € | |
| Axis | 2025 | 1 783 cm² | 140 cm | 11 | 168 mm | — | 1,9/10 * | 11 km/h | ≈ 908 € | |
| Alpinefoil | ≈ 2024 | 1 790 cm² | 124 cm | 8,6 | — | — | 2,7/10 * | 11 km/h | 829 € | |
| Axis | 2025 | 1 800 cm² | 120 cm | 8 | 195 mm | — | 2,9/10 * | 11 km/h | ≈ 784 € | |
| Eleveight | ≈ 2026 | 1 800 cm² | — | — | — | — | — | 11 km/h | 1 559 € | |
| F-One | ≈ 2025 | 1 800 cm² | 95 cm | 5 | — | — | 4,5/10 * | 11 km/h | 279 € | |
| Takoon | 2024 | 1 800 cm² | 100 cm | 5,6 | 225 mm | 31 mm | 2,4/10 | 10 km/h | 279 € | |
| Naish | 2026 | 1 840 cm² | 112 cm | 6,8 | — | — | 3,3/10 * | 11 km/h | ≈ 346 € | |
| Armstrong | ≈ 2024 | 1 850 cm² | 97 cm | 5 | — | — | 4,3/10 * | 11 km/h | 589 €* | |
| Core | ≈ 2026 | 1 850 cm² | 97 cm | 5,1 | — | — | 4,3/10 * | 11 km/h | 579 € | |
| Ensis | ≈ 2026 | 1 850 cm² | 105 cm | 6 | 220 mm | — | 3,7/10 * | 11 km/h | 561 € | |
| North | 2024 | 1 850 cm² | 96 cm | 5 | — | — | 4,4/10 * | 11 km/h | 546 € | |
| North | 2024 | 1 850 cm² | 96 cm | 5 | — | — | 4,4/10 * | 11 km/h | 489 € | |
| Slingshot | ≈ 2025 | 1 850 cm² | 99 cm | 5,3 | — | — | 4,1/10 * | 11 km/h | 749 € | |
| Code Foils | ≈ 2026 | 1 870 cm² | 130 cm | 9 | — | — | 2,3/10 * | 10 km/h | 1 220 €* | |
| Duotone | 2026 | 1 900 cm² | 114 cm | 6,8 | — | — | 3,1/10 * | 10 km/h | 539 € | |
| F-One | 2026 | 1 900 cm² | 140 cm | 10,3 | — | — | 1,8/10 * | 10 km/h | 1 089 € | |
| Indiana | 2026 | 1 935 cm² | 132 cm | 9 | 186 mm | 23,5 mm | 1,2/10 | 10 km/h | — | |
| GONG | 2026 | 1 940 cm² | 156 cm | 12,5 | 170 mm | 22 mm | 0,3/10 | 10 km/h | 469 € | |
| Alpinefoil | 2026 | 1 950 cm² | 136 cm | 9,5 | — | — | 1,9/10 * | 10 km/h | 929 € | |
| GONG | 2026 | 1 950 cm² | 146 cm | 10,9 | 183 mm | 25,8 mm | 0,2/10 | 10 km/h | 699 € | |
| GONG | 2024 | 2 000 cm² | 156 cm | 12,2 | 170 mm | 23 mm | 0,1/10 | 10 km/h | 489 € | |
| Naish | 2026 | 2 000 cm² | — | — | — | — | — | 10 km/h | ≈ 368 € | |
| Naish | 2026 | 2 000 cm² | 100 cm | 5 | — | — | 3,9/10 * | 10 km/h | ≈ 405 € | |
| Naish | 2024 | 2 000 cm² | 100 cm | 5 | — | — | 3,9/10 * | 10 km/h | ≈ 428 € | |
| Sroka | ≈ 2026 | 2 000 cm² | — | — | — | — | — | 10 km/h | 379 € | |
| Takoon | 2024 | 2 000 cm² | 106 cm | 5,6 | 238 mm | 32,5 mm | 1,7/10 | 10 km/h | 299 € | |
| North | 2024 | 2 100 cm² | 100 cm | 4,8 | — | — | 3,8/10 * | 10 km/h | 561 € | |
| North | 2024 | 2 100 cm² | 100 cm | 4,8 | — | — | 3,8/10 * | 10 km/h | 499 € | |
| Sabfoil | 2025 | 2 122 cm² | 84 cm | 3,3 | — | — | 5,1/10 * | 10 km/h | 790 € | |
| Core | ≈ 2026 | 2 150 cm² | 104 cm | 5 | — | — | 3,5/10 * | 10 km/h | 579 € | |
| Ensis | ≈ 2026 | 2 200 cm² | 109 cm | 5,4 | 250 mm | — | 3,1/10 * | 10 km/h | 649 € | |
| KT Foiling | 2025 | 2 200 cm² | 105 cm | 5 | — | — | 3,4/10 * | 10 km/h | 595 €* | |
| Sroka | ≈ 2026 | 2 200 cm² | — | — | — | — | — | 10 km/h | 389 € | |
| Code Foils | ≈ 2026 | 2 220 cm² | 170 cm | 13 | — | — | 0,2/10 * | 10 km/h | 1 755 €* | |
| Slingshot | ≈ 2025 | 2 250 cm² | 109 cm | 5,3 | — | — | 3,1/10 * | 10 km/h | 799 € | |
| Indiana | 2025 | 2 274 cm² | 170 cm | 12,6 | 173 mm | 22,5 mm | 0/10 | 9 km/h | 819 €* | |
| GONG | 2026 | 2 313 cm² | 186 cm | 15 | 170 mm | 22 mm | 0/10 | 9 km/h | 549 € | |
| GONG | 2026 | 2 350 cm² | 161 cm | 11 | 201 mm | 28,3 mm | 0/10 | 9 km/h | 799 € | |
| Duotone | 2025 | 2 400 cm² | 111 cm | 5,1 | — | — | 2,8/10 * | 9 km/h | 559 € | |
| GONG | 2024 | 2 400 cm² | 186 cm | 14,4 | 170 mm | 23 mm | 0/10 | 9 km/h | 559 € | |
| North | 2024 | 2 400 cm² | 104 cm | 4,5 | — | — | 3,3/10 * | 9 km/h | 509 € | |
| Sabfoil | 2025 | 2 445 cm² | 104 cm | 4,4 | — | — | 3,3/10 * | 9 km/h | 819 € | |
| Armstrong | ≈ 2024 | 2 450 cm² | 105 cm | 4,5 | — | — | 3,2/10 * | 9 km/h | 609 €* | |
| Naish | 2026 | 2 450 cm² | — | — | — | — | — | 9 km/h | ≈ 400 € | |
| Naish | 2024 | 2 450 cm² | 100 cm | 4,1 | — | — | 3,5/10 * | 9 km/h | ≈ 478 € | |
| Sabfoil | 2025 | 2 742 cm² | 124 cm | 5,6 | — | — | 1,8/10 * | 9 km/h | 849 € | |
| GONG | 2024 | 3 100 cm² | 249 cm | 20 | 180 mm | 24,4 mm | 0/10 | 8 km/h | 699 € |
Méthode et sources
Voir le tableau pour tous les poids (50 à 110 kg)
| Poids du rider | 500 cm² | 800 cm² | 1 000 cm² | 1 200 cm² | 1 400 cm² | 1 600 cm² | 1 900 cm² |
|---|---|---|---|---|---|---|---|
| 50 kg | 17 km/h | 13 km/h | 12 km/h | 11 km/h | 10 km/h | 9 km/h | 8 km/h |
| 60 kg | 18 km/h | 14 km/h | 13 km/h | 12 km/h | 11 km/h | 10 km/h | 9 km/h |
| 70 kg | 20 km/h | 15 km/h | 14 km/h | 12 km/h | 11 km/h | 11 km/h | 10 km/h |
| 80 kg | 21 km/h | 16 km/h | 15 km/h | 13 km/h | 12 km/h | 11 km/h | 10 km/h |
| 90 kg | 22 km/h | 17 km/h | 15 km/h | 14 km/h | 13 km/h | 12 km/h | 11 km/h |
| 100 kg | 23 km/h | 18 km/h | 16 km/h | 15 km/h | 13 km/h | 13 km/h | 11 km/h |
| 110 kg | 24 km/h | 19 km/h | 17 km/h | 15 km/h | 14 km/h | 13 km/h | 12 km/h |
Plus une frontwing est grande, plus elle décolle tôt. Plus elle est petite, plus elle va vite et tourne vivement. Choisissez votre poids : le tableau donne le décollage estimé pour chaque surface, avec 14 kg de matériel (board de wing, wing, mât, fuselage et stab).
Même calcul que le comparateur, avec une épaisseur de profil de 11 %. Ce sont des estimations à comparer entre elles. Comment c'est calculé →
Quelle taille de frontwing pour le wingfoil selon votre poids ? Tableau des tailles · Quelle taille de wing pour le wingfoil selon le vent et votre poids ? Tableau des tailles · Quel volume de planche de wing foil selon votre poids ? Tableau des volumes · Quelle taille de stab pour le wingfoil ? Tableau des tailles · Tous les guides Wingfoil
Prix et stock relevés tous les deux jours ; prix suivi d'un astérisque : prix revendeur ; « ≈ » : prix en dollars converti. Ratio = envergure² / surface.